 | Brooklyn Bridge | NYSDOT - Region 11: attenuator repairs and bridge painting and longterm construction on Brooklyn Bridge eastbound Brooklyn Bound (Manhattan/Brooklyn) these lanes will be closed to facilitate the Brooklyn Bridge approach ramps and painting capital project through April 2014..Note: No closures will occur Sunday, April 8th from 12:01am to 9am or 11pm Sunday, April 8th to 6am Monday, April 9th, 2012., Monday November 1st, 2010 thru Wednesday April 30th, 2014, Monday thru Friday, 10:00 AM thru 03:00 PM, alternate lanes closed, Monday November 1st, 2010 thru Wednesday April 30th, 2014, Monday thru Friday, 11:00 PM thru 06:00 AM, alternate lanes closed, Monday November 1st, 2010 thru Wednesday April 30th, 2014, Saturday/Sunday, 02:00 AM thru 02:00 PM, alternate la | New York/Kings | New York City Area | 4/4/2012 3:29:10 PM | Construction | Brooklyn Bridge |
 | Brooklyn Bridge | NYSDOT - Region 11: longterm construction on Brooklyn Bridge westbound Manhattan Bound (Manhattan/Brooklyn) Note: No closures will occur Sunday, April 8th from 12:01am to 9am or 11pm Sunday, April 8th to 6am Monday, April 9th, 2012., Monday November 1st, 2010 thru Wednesday April 30th, 2014 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 06:00 AM, alternate lanes closed, Monday November 1st, 2010 thru Wednesday April 30th, 2014, Monday thru Friday, 10:00 AM thru 03:00 PM, alternate lanes closed, Monday November 1st, 2010 thru Wednesday April 30th, 2014, 01:00 AM thru 07:00 AM, alternate lanes closed, Monday November 1st, 2010 thru Wednesday April 30th, 2014, 01:00 AM thru 09:00 AM, alternate lanes closed | New York/Kings | New York City Area | 4/4/2012 3:27:39 PM | Construction | Brooklyn Bridge |
 | Queens Midtown Tunnel | MTA Bridges & Tunnels: Security Check Point on Queens Midtown Tunnel both directions Manhattan/Queens Bound (Manhattan/Queens) Placarded vehicles and tanker trucks banned. All vehicles are subject to inspection. | New York/Queens | New York City Area | 3/4/2013 5:38:18 AM | General Information | Queens Midtown Tunnel |
 | Belt System - Shore Parkway | NYSDOT - Region 11: longterm construction on Belt System - Shore Parkway both directions between Exit 11B - Flatbush Avenue; Ramp (New York) and Exit 14 - Pennsylvania Avenue (New York) All three westbound lanes will be shifted onto a new temporary bridge over Fresh Creek for approximately 30 months., Monday November 1st, 2010 thru Friday October 31st, 2014, Monday thru Friday, 10:00 AM thru 02:00 PM, 1 lane closed, Sunday October 31st, 2010 thru Friday October 31st, 2014 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 01:00 AM, 1 lane closed, Monday November 1st, 2010 thru Friday October 31st, 2014, Monday thru Friday, 01:00 AM thru 05:00 AM, 2 lanes closed | Kings | New York City Area | 7/27/2011 3:06:53 PM | Construction | Belt System - Shore Parkway |
 | East 59th Street | NYSDOT - Region 11: longterm construction on East 59th Street between 3rd Avenue and 2nd Avenue, Saturday November 13th, 2010 thru Sunday June 30th, 2013, Saturday/Sunday, 07:00 AM thru 05:00 PM, all lanes, closed | New York | New York City Area | 1/1/2013 2:05:57 AM | Construction | East 59th Street |
 | 2nd Avenue | NYSDOT - Region 11: longterm construction on 2nd Avenue southbound from 73rd Street (Manhattan) to 68th Street (Manhattan) all other times 3 lanes are maintained to facilitate NYCT 2nd Avenue Subway construction activity, Monday December 21st, 2009 thru Monday December 30th, 2013, Monday thru Friday, 07:00 AM thru 07:00 PM, 4 lanes open | New York | New York City Area | 12/11/2012 6:50:57 AM | Construction | 2nd Avenue |
 | 2nd Avenue | NYSDOT - Region 11: longterm construction on 2nd Avenue southbound between East 88th Street (Manhattan) and East 81st Street (Manhattan) Three lanes maintained at all other times, Saturday December 19th, 2009 thru Tuesday September 30th, 2014, Monday thru Friday, 07:00 AM thru 10:00 AM, 4 lanes open, Saturday December 19th, 2009 thru Tuesday September 30th, 2014, Monday thru Friday, 03:00 PM thru 07:00 PM, 4 lanes open | New York | New York City Area | 5/21/2012 1:06:47 PM | Construction | 2nd Avenue |
 | I-278 | NYSDOT - Region 11: longterm construction on I-278 westbound at 65th Street (New York) , Continuous Friday December 10th, 2010 12:00 AM thru Monday December 30th, 2013 11:59 PM left lane closed | Kings | New York City Area | 7/27/2011 3:15:23 PM | Construction | I-278 |
 | NY 28A | NYSDOT - Region 8: roadwork on NY 28A both directions east of NY 213 (Olive) , Tuesday January 11th, 2011 thru Tuesday December 31st, 2013, Sunday thru Saturday, 12:00 AM thru 11:59 PM, | Ulster | Hudson Valley Catskill Area | 12/31/2012 11:59:13 PM | Construction | NY 28A |
 | Norton Road | NYSDOT - Region 8: roadwork on Norton Road both directions between NY 116 (North Salem) and Wallace Road (North Salem) , Continuous Tuesday January 11th, 2011 8:00 AM thru Tuesday December 31st, 2013 11:59 PM all lanes closed | Westchester | Hudson Valley Catskill Area | 12/18/2012 10:20:13 AM | Closure Construction | Norton Road |
 | Walker Mills Road | NYSDOT - Region 8: roadwork on Walker Mills Road both directions between Wire Road (Germantown) and CR 31 (Blue Hill Road) (Germantown) , Continuous Tuesday January 11th, 2011 10:00 AM thru Tuesday December 31st, 2013 11:59 PM all lanes closed | Columbia | Hudson Valley Catskill Area | 12/18/2012 10:28:58 AM | Closure Construction | Walker Mills Road |
 | Millbrook Road | NYSDOT - Region 8: roadwork on Millbrook Road both directions between Schoolhouse Road (Hudson) and Orchard Road (Hudson) , Continuous Thursday January 13th, 2011 8:30 AM thru Tuesday December 31st, 2013 11:59 PM all lanes closed | Columbia | Hudson Valley Catskill Area | 12/18/2012 10:17:06 AM | Closure Construction | Millbrook Road |
 | Stone Mill Road | NYSDOT - Region 8: roadwork on Stone Mill Road both directions between Fingar Road (Hudson) and NY 9H (Hudson) , Continuous Friday January 14th, 2011 12:00 AM thru Tuesday December 31st, 2013 11:59 PM all lanes closed | Columbia | Hudson Valley Catskill Area | 2/18/2013 12:32:49 AM | Closure Construction | Stone Mill Road |
 | NY 9A | NYSDOT - Region 11: longterm construction on NY 9A between (Manhattan) and Albany Street (New York) The 9A Bikeway has been shifted into construction-related re-aligment along Vesey St the North Cove waterfront promenade, South End Ave & Albany St Bicyclist should follow the sign and road-marked detour due to construction by the PANYNJ til Dec 2013., Thursday February 3rd, 2011 thru Tuesday December 31st, 2013, Sunday thru Saturday, 12:00 AM thru 11:59 PM, | New York | New York City Area | 7/27/2011 2:53:13 PM | Construction | NY 9A |
 | NY 25 | NYSDOT - Region 11: longterm construction on NY 25 both directions over I-678 (New York) , Continuous Friday February 11th, 2011 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 1 lane closed, Continuous Friday February 11th, 2011 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 2 lanes open | Queens | New York City Area | 12/31/2012 1:02:09 PM | Construction | NY 25 |
 | NY 9A | NYSDOT - Region 11: construction on NY 9A northbound between Albany Street (New York) and Liberty Street (New York) the northbound left turn will be restricted and the left turn will be permitted at the prior intersection of Albany Street, Continuous Saturday February 26th, 2011 12:00 AM thru Tuesday December 31st, 2013 11:59 PM | New York | New York City Area | 7/27/2011 2:53:07 PM | Construction | NY 9A |
 | East Houston Street | NYSDOT - Region 11: construction on East Houston Street between Bowery (New York) and FDR Drive (Manhattan) to facilitate NYCDDC roadway reconstruction, Continuous Friday February 25th, 2011 12:00 AM thru Sunday June 30th, 2013 11:59 PM 1 lane closed | New York | New York City Area | 1/23/2013 11:51:49 AM | Construction | East Houston Street |
 | Belt System - Shore Parkway | NYSDOT - Region 11: longterm construction on Belt System - Shore Parkway westbound between Exit 11B - Flatbush Avenue; Ramp (New York) and Exit 14 - Pennsylvania Avenue (New York) As of March 3rd, 2011 all three westbound lanes between Pennylvania Avenue and Rockaway will shift onto a new temporary bridge over Fresh Creek for approximately 30 months, Continuous Thursday March 3rd, 2011 12:00 AM thru Monday June 30th, 2014 12:00 AM 3 westbound all lanes open | Kings | New York City Area | 7/27/2011 3:06:01 PM | Construction | Belt System - Shore Parkway |
 | Franklin County Road 29 | NYSDOT: closed to traffic on Franklin County Road 29 northbound into Quebec, Canada, at Jamison Line Crossing just north of North Burke, Town of Burke, Franklin County, New York starting 12:13 AM, 04/01/11 until further notice. Comment: NB Rte 29 is closed at the Canadian border to all traffic. | Franklin | Adirondack Watertown Plattsburgh Area | 9/20/2012 6:38:30 AM | Closure Incidents | Franklin County Road 29 |
 | Chester Drive | NYSDOT - Region 8: roadwork on Chester Drive both directions west of Nucifora Boulevard (Chester) , Continuous Tuesday May 17th, 2011 12:00 AM thru Tuesday December 31st, 2013 11:59 PM all lanes closed | Orange | Hudson Valley Catskill Area | 12/18/2012 10:12:55 AM | Closure Construction | Chester Drive |
 | I-278 | NYSDOT - Region 11: construction on I-278 westbound between Fingerboard Road; Verrazano Narrows Bridge (Staten Island) and Exit 13 - Milford Drive; Clove Road (Staten Island) , Monday January 14th, 2013 thru Thursday May 23rd, 2013, Monday thru Friday, 09:00 AM thru 03:00 PM, 1 lane closed | Richmond | New York City Area | 5/17/2013 5:08:36 PM | Construction | I-278 |
 | Fourth Avenue | NYSDOT - Region 11: longterm construction on Fourth Avenue southbound between Flatbush Avenue (New York) and Atlantic Avenue This street will be converted from a two-way to one-way southbound as related to Atlantic Yards project., Continuous Friday July 29th, 2011 12:00 AM thru Monday December 29th, 2014 12:00 AM 1 lane open | Kings | New York City Area | 8/8/2012 2:16:29 PM | Construction | Fourth Avenue |
 | 11th Avenue | NYSDOT - Region 11: longterm construction on 11th Avenue northbound between West 35th Street (New York) and West 37th Street (New York) to facilitate NYCT seven line extension building and roadway construction activity, Wednesday August 10th, 2011 thru Tuesday December 31st, 2013, Sunday thru Saturday, 12:00 AM thru 11:59 PM, 1 lane open | New York | New York City Area | 12/11/2012 6:58:05 AM | Construction | 11th Avenue |
 | 11th Avenue | NYSDOT - Region 11: construction on 11th Avenue southbound between West 37th Street (New York) and West 35th Street (New York) to facilitate NYCT seven line extension building and roadway construction activity. New Traffic Pattern 2 lanes southbound closed.One lane northbound closed. NYCDOT NO2-2011265-176., Continuous Wednesday August 10th, 2011 12:00 AM thru Tuesday December 31st, 2013 12:00 AM 3 lanes open | New York | New York City Area | 12/11/2012 7:03:25 AM | Construction | 11th Avenue |
 | Queens Midtown Tunnel | MTA Bridges & Tunnels: operational activity at Queens Midtown Tunnel both directions Manhattan/Queens Bound (Manhattan/Queens) two way traffic in south tunnel, drive with caution, Monday January 14th, 2013 thru Wednesday July 31st, 2013, Monday thru Friday, 06:00 AM thru 10:00 AM | New York/Queens | New York City Area | 1/14/2013 6:42:22 AM | Special Events | Queens Midtown Tunnel |
 | Brooklyn Battery Tunnel | MTA Bridges & Tunnels: operational activity at Brooklyn Battery Tunnel both directions Manhattan/Brooklyn Bound (Manhattan/Brooklyn) two way traffic in west tunnel, drive with caution, Monday January 14th, 2013 thru Wednesday July 31st, 2013, Monday thru Friday, 06:00 AM thru 10:00 AM | New York/Kings | New York City Area | 1/14/2013 6:55:14 AM | Special Events | Brooklyn Battery Tunnel |
 | NY 96 | NYSDOT: closed to traffic, long term road construction on NY 96 in both directions at Owego Street; NY 96B until 4:00 PM, 10/31/13. Comment: DETOUR: Route 96 North thru traffic use SR 96B and Mill Street from the SR 96 and SR 96B intersection to SR 96 and Mill Street intersection as the detour route around the bridge. | Tioga | Southern Tier Homell Elmira Binghamton Area | 4/6/2013 2:53:21 PM | Closure Construction | NY 96 |
 | NY 96 | NYSDOT: long term road construction on NY 96 both directions at Owego Street; NY 96B (Candor) closed to traffic. Comment: detour: Route 96 North thru traffic use R-96B to Mill Street back to R-96 and R-96 South thru traffic use Mill Street to R-96B back to R-96 | Tioga | Southern Tier Homell Elmira Binghamton Area | 12/14/2011 11:49:20 AM | Closure Construction | NY 96 |
 | NY 56 | NYSDOT: road construction on NY 56 from after Town of Parishville; Town of Colton Line to South Colton Windmill Road until 9:00 AM, 10/31/13. Comment: Highway realignment and replacement of the RT. 56 over Cold Brook Bridge. | St. Lawrence | Adirondack Watertown Plattsburgh Area | 4/24/2012 9:56:34 AM | Construction | NY 56 |
 | NY 17 | NYSDOT: long term road construction, reduced to one lane, width limit on NY 17 in both directions from Exit 107 - CR 173 to Exit 109 - Katrina Falls Road until 6:00 PM, 10/10/14. Comment: 10 foot width restriction | Sullivan | Hudson Valley Catskill Area | 10/12/2012 11:38:00 AM | Construction | NY 17 |
 | I-88 | NYSDOT: long term road construction, width limit, reduced to one lane on I-88 westbound from Exit 6 - NY 79 to Exit 7 - I-88 (Exit 7) connector to NY 41 until 4:30 PM, 08/30/13. Comment: 14' width restriction in the westbound lane. | Broome | Southern Tier Homell Elmira Binghamton Area | 3/31/2013 3:20:29 PM | Construction | I-88 |
 | US 15 | NYSDOT: road construction on US 15 in both directions from Steuben County Line; PA State Line to Town of Erwin; Town of Lindley Line; Ramp until 5:00 PM, 07/30/14. Comment: Rte 15 construction Lane reduction for construction of southbound crossover one mile north of exit 1Steel erection for new Rte. 15 structure over Stowell Rd. approximately 1/8 mile up Stowell Rd. off of Rte. 15 will be closed. The public is ask to use alternate route, no designated detour. Start date 12:00 pm 11/12/12 through 5:30 pm 11/15/12. | Steuben | Southern Tier Homell Elmira Binghamton Area | 11/11/2012 8:31:39 AM | Construction | US 15 |
 | NY 17 | NYSDOT: entrance ramp closed, long term road construction on NY 17 eastbound at Exit 107 - CR 173 until 6:00 PM, 07/19/13. Comment: ALL TRAFFIC IS DETOURED TO EXIT 106 | Sullivan | Hudson Valley Catskill Area | 10/12/2012 11:36:00 AM | Closure Construction | NY 17 |
 | Hudson Street | NYSDOT - Region 11: longterm construction on Hudson Street between Franklin Street (New York) and Laight Street Thuis street will be narrowed to two lanes of traffic (with no access to the Holland Tunnel) to facilitateNYCDDC truck watermain work through 2015., Continuous Monday May 21st, 2012 12:00 AM thru Monday December 21st, 2015 12:00 AM 2 lanes open | New York | New York City Area | 5/21/2012 12:42:58 PM | Construction | Hudson Street |
 | East 59th Street | NYSDOT - Region 11: construction on East 59th Street between 1st Avenue (New York) and 2nd Avenue Access to the Queensboro Bridge South Outer roadway is not affected., Continuous Monday May 21st, 2012 12:00 AM thru Tuesday December 31st, 2013 12:00 AM 1 lane open | New York | New York City Area | 5/21/2012 2:11:46 PM | Construction | East 59th Street |
 | Belt System - Shore Parkway | NYSDOT - Region 11: longterm construction on Belt System - Shore Parkway both directions between Exit 11B - Flatbush Avenue; Ramp (New York) and Exit 14 - Pennsylvania Avenue (New York) to facilitate bridge reconstruction., Monday May 21st, 2012 thru Friday October 31st, 2014, Monday thru Friday, 10:00 AM thru 02:00 PM, 1 lane closed, Monday May 21st, 2012 thru Friday October 31st, 2014, Monday thru Friday, 10:00 PM thru 05:00 AM, 1 lane closed, Monday May 21st, 2012 thru Friday October 31st, 2014, Monday thru Friday, 01:00 AM thru 05:00 AM, 2 lanes closed | Kings | New York City Area | 5/21/2012 2:47:34 PM | Construction | Belt System - Shore Parkway |
 | Nassau Avenue | NYSDOT - Region 11: longterm construction on Nassau Avenue westbound between Manhattan Avenue (New York) and Apollo Street Street converted into a one-way westbound to facilitate NYCDDC roadway reconstruction., Monday May 21st, 2012 thru Tuesday December 31st, 2013, Sunday thru Saturday, 12:00 AM thru 12:00 AM, lane open | Kings | New York City Area | 5/21/2012 2:52:13 PM | Construction | Nassau Avenue |
 | Narrows Road South | NYSDOT - Region 11: construction on Narrows Road South eastbound from Fingerboard Road (Staten Island) to Verrazano Narrows Bridge entrance ramp to facilitate MTA construction of a fly over ramp., Continuous Monday May 21st, 2012 12:00 AM thru Tuesday December 31st, 2013 12:00 AM 2 lanes open | Richmond | New York City Area | 5/21/2012 3:20:21 PM | Construction | Narrows Road South |
 | NY 251 | NYSDOT: closures on NY 251 at Monroe-Ontario County Line (Mendon) closed to traffic until 4:00 P.M. Friday, June 29, 2012. Comment: Route 251 is CLOSED AT PHILLIPS RD for Reconstruction and Culvert Replacement. Truck and Local Detours are Posted. | Monroe | Finger Lakes Rochester Area | 5/22/2012 6:48:07 AM | Closure Construction | NY 251 |
 | NY 77 | NYSDOT: long term road construction on NY 77 in both directions from Main Road; NY 5 to Broadway; US 20 until 5:30 PM, 06/30/13 on weekday(s). Comment: Shoulder work. | Genesee | Niagara Buffalo Area | 4/24/2013 2:56:41 PM | Construction | NY 77 |
 | US 11 | NYSDOT: road construction on US 11 from West Main Street; Start NY 68 Overlap to Stiles Avenue; Village of Canton; Town of Canton until 1:00 PM, 11/30/13. Comment: Traffic disruptions will be controlled by signs and flaggers. Motorists should expect delays. There is a detour in place that thru traffic is encouaged to use. | St. Lawrence | Adirondack Watertown Plattsburgh Area | 4/15/2013 1:40:15 PM | Construction | US 11 |
 | US 11 | NYSDOT: road construction on US 11 from 971L; Connector from NY 190 to US 11 to Town of Mooers; Town of Altona Line until 1:00 PM, 06/30/13. Comment: Highway rehabilitation on Rt. 11 in Ellenburg. Any traffic disruptions will be controlled by signs and flaggers. | Clinton | Adirondack Watertown Plattsburgh Area | 5/29/2012 1:29:49 PM | Construction | US 11 |
 | Systemwide | MTA Long Island Rail Road: due to operational activity, Systemwide (New York) In an effort to maintain orderly travel for our customers, alcoholic beverages are not allowed on overnight weekend trains. Alcohol is also banned on station platforms., Saturday June 23rd, 2012 thru Monday June 23rd, 2014, Saturday/Sunday, 12:00 AM thru 05:00 AM | New York | New York City Area | 4/22/2013 5:26:23 AM | Special Events | Systemwide |
 | US 9 | NYSDOT: single line traffic alternating directions and temporary traffic lights on US 9 both directions at Town of Chesterfield; Town of Lewis Line (Chesterfield) | Essex | Adirondack Watertown Plattsburgh Area | 5/19/2013 3:32:30 PM | Construction | US 9 |
 | NY 34B | NYSDOT: road maintenance operations on NY 34B both directions between START ROUTE NY 34B; Peru Road; NY 38; Groton Road and Town of Dryden; Town of Groton Line (Dryden) closed to traffic. Comment: Suggested detour is West Dryden Road to Caswell Road. | Tompkins | Southern Tier Homell Elmira Binghamton Area | 7/19/2012 7:25:51 AM | Closure Construction | NY 34B |
 | Pipeline Road | Westchester Co. DPW: longterm construction on Pipeline Road between Edgemont Place (Greenburgh) and Bronx River Parkway (Greenburgh) and ramp to southbound parkway south of Edgemont Pl both closed, Continuous Monday July 23rd, 2012 7:00 AM thru Friday April 3rd, 2015 4:00 PM | Westchester | Hudson Valley Catskill Area | 12/11/2012 1:07:06 PM | Construction | Pipeline Road |
 | NY 31 | NYSDOT: closed on NY 31 at Vienna Road; CR 318 due to bridge maintenance operations starting 10:00:00 AM, 7/26/2012 until further notice. Comment: The Galloway Road bridge over the Erie Canal will be closed to traffic until further notice for repairs | Wayne | Finger Lakes Rochester Area | 7/26/2012 10:01:38 AM | Closure Incidents | NY 31 |
 | NY 30 | NYSDOT: lane closures on NY 30 between Amsterdam Mall (Amsterdam) and Storrie Street (Amsterdam) | Montgomery | Capital Region Albany Saratoga Area | 5/19/2013 3:32:15 PM | Incidents | NY 30 |
 | US 9W | NYSDOT - Region 8: roadwork on US 9W both directions between Deyo Place (Newburgh) and Mill Street (New Windsor) , Continuous Wednesday May 23rd, 2012 12:00 AM thru Monday September 30th, 2013 11:59 PM 1 lane closed | Orange | Hudson Valley Catskill Area | 4/30/2013 11:07:26 AM | Construction | US 9W |
 | NY 104 | NYSDOT: closures on NY 104 east at NY 390 (Greece) entrance ramp closed. Comment: EB104 entance ramp to 390SB will be closed for over head sign work until furhter notice | Monroe | Finger Lakes Rochester Area | 8/12/2012 8:46:33 PM | Closure Construction | NY 104 |
 | West 34th Street | NYSDOT - Region 11: longterm construction on West 34th Street westbound between 10th Avenue (New York) and 11th Avenue One lane open Eastbound, Continuous Friday August 17th, 2012 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 2 lanes open | New York | New York City Area | 8/17/2012 2:47:24 PM | Construction | West 34th Street |
 | NY 31 | NYSDOT: closed for repairs on NY 31 at Town of Lyons and Town of Arcadia Line starting 5:44:00 PM, 8/17/2012 until further notice. Comment: NYSDOT has to close the bridge over the ERIE canal on County House Road between Old Lyons Rd. and Rt31. Emergency work has brought upon the closure | Wayne | Finger Lakes Rochester Area | 8/17/2012 5:45:44 PM | Closure Incidents | NY 31 |
 | NY 63 | NYSDOT: road maintenance operations on NY 63 between Town of Oakfield; Town of Alabama Line and Knowlesville Road; CR 23 closed for repairs. Comment: NY 63 between Hutton Rd. and Macomber Rd. will be closed until further notice for emergency repairs. | Genesee | Niagara Buffalo Area | 9/2/2012 12:00:11 AM | Closure Construction | NY 63 |
 | NY 22 | NYSDOT: road construction on NY 22 at I-87 starting 11:40:00 AM, 9/25/2012 until further notice. Comment: Motorists should be aware of daily lane closures. | Clinton | Adirondack Watertown Plattsburgh Area | 5/6/2013 9:07:54 AM | Construction | NY 22 |
 | W Hempstead Branch | MTA Long Island Rail Road: due to operational activity, both directions W Hempstead Branch between West Hempstead Station (Nassau County) and New York Penn Station (Manhattan) No weekend service. As an alternative, customers are advised to use the Hempstead, Lynbrook, Valley Stream or Merillon Avenue stations (all located in Fare Zone 4), Friday September 28th, 2012 thru Saturday September 28th, 2013, 12:00 AM thru 11:59 PM | Nassau | Long Island Area | 10/14/2012 2:17:32 AM | Special Events | W Hempstead Branch |
 | W Hempstead Branch | MTA Long Island Rail Road: due to operational activity, both directions W Hempstead Branch between New York Penn Station (Manhattan) and West Hempstead Station (Nassau County) No weekend service. As an alternative, customers are advised to use the Hempstead, Lynbrook, Valley Stream or Merillon Avenue stations (all located in Fare Zone 4), Monday October 1st, 2012 thru Tuesday October 1st, 2013, None, 12:01 AM thru 05:00 AM | New York | New York City Area | 4/22/2013 5:27:47 AM | Special Events | W Hempstead Branch |
 | W Hempstead Branch | MTA Long Island Rail Road: due to operational activity, both directions W Hempstead Branch between New York Penn Station (Manhattan) and West Hempstead Station (Nassau County) No weekend service. As an alternative, customers are advised to use the Hempstead, Lynbrook, Valley Stream or Merillon Avenue stations (all located in Fare Zone 4), Sunday October 14th, 2012 thru Tuesday October 14th, 2014, 12:00 AM thru 11:59 PM | New York | New York City Area | 10/15/2012 12:38:02 AM | Special Events | W Hempstead Branch |
 | NY 86 | NYSDOT: single line traffic alternating directions, temporary traffic lights on NY 86 in both directions from Town of Jay; Town of Wilmington Line to NY 431 due to road construction starting 7:00:00 AM, 10/17/2012 until further notice. Comment: This roadwork is a 1/2 mile north of Fox Farm Rd on the bridge over the Ausable River | Essex | Adirondack Watertown Plattsburgh Area | 10/30/2012 11:53:41 AM | Construction | NY 86 |
 | Ryerson Road | NYSDOT - Region 8: roadwork on Ryerson Road both directions between Jocey Hollow Road (Warwick) and NY 94 (Warwick) , Continuous Monday October 22nd, 2012 12:00 AM thru Tuesday December 31st, 2013 11:59 PM all lanes closed | Orange | Hudson Valley Catskill Area | 12/18/2012 10:21:51 AM | Closure Construction | Ryerson Road |
 | NY 5 | NYSDOT: long term road construction, reduced to one lane, delays on NY 5 in both directions at Western Gateway Bridge; Village of Scotia City of Schenectady Line starting 7:00:00 AM, 10/23/2012 until further notice. Comment: Rt 5 will be reduced to one lane in each direction across the Rt 5 / Mohawk River (Western Gateway) bridge, beginning the week of October 22. To avoid delays, drivers should consider alternate routes across the Mohawk River. The two closest options are Rt 890 over the Mohawk River near the Rt 5 / Vley Rd intersection, and Freemans Bridge Rd over the Mohawk River off of Maxon Rd Extension | Schenectady | Capital Region Albany Saratoga Area | 10/24/2012 7:16:11 AM | Construction | NY 5 |
 | NY 373 | NYSDOT: closures on NY 373 both directions at Ferry Terminal (Chesterfield) closed to traffic. Comment: The The Charlotte, VT - Essex, NY ferry crossing will be closing early on Monday, 10/29. The last departure out of VT is 5:00 pm, last departure out of NY is 5:30pm. | Essex | Adirondack Watertown Plattsburgh Area | 10/29/2012 5:18:23 PM | Closure Construction | NY 373 |
 | NY 17 | NYSDOT: bridge maintenance operations, reduced to two lanes on NY 17 in both directions at Exit 70N - NY 201 until 4:00 PM, 05/31/13. | Broome | Southern Tier Homell Elmira Binghamton Area | 4/25/2013 4:00:20 PM | Construction | NY 17 |
 | I-87 Northway | NYSDOT: bridge construction, reduced to one lane on I-87 Northway in both directions from after NY 3 to Exit 39 - NY 314 Ramp starting 8:33:00 AM, 3/29/2013 until further notice. Comment: I87 North and South bound passing lanes near Exit 38 in the Town of Plattsburgh are closed with speed reduced to 45 MPH. Northbound I87 cross-over will be activated on April 18th , and the North bound I87- on ramp from Rte 22 west leaving the City of Plattsburgh, will be closed at Exit 38. Traffic entering I87 Northbound from the City of Plattsburgh will need to follow the signed detoured to Exit 39. Lane Restrictions of 16' southbound and 18' northbound are in effect. This traffic pattern will be in effect until early October for the north bound bridge replacement ov | Clinton | Adirondack Watertown Plattsburgh Area | 4/17/2013 1:29:09 PM | Construction | I-87 Northway |
 | I-95 | NYSDOT - Region 11: New traffic Pattern, construction on I-95 southbound approaching I-87 Major Deegan Expressway (New York) New Traffic Pattern in effect through June 2013. Two left lanes can only access George Washington Bridge Upper Level. | Bronx | New York City Area | 4/30/2013 9:05:08 AM | Incidents | I-95 |
 | NY 206 | NYSDOT: road construction on NY 206 both directions between East Main Street; NY 26; START ROUTE NY 206; Hickory Street; NY 79 and Broome-Chenango County Line (Greene) | Broome | Southern Tier Homell Elmira Binghamton Area | 5/19/2013 3:32:05 PM | Construction | NY 206 |
 | NY 3 | NYSDOT: bridge construction, reduced to one lane on NY 3 in both directions from West 1st Street South; NY 48 to South 1st Street until 6:00 PM, 05/30/13. Comment: Bridge will be reduced to one lane 24/7 in both directions by using concrete barriers. | Oswego | Central Syracuse Utica Area | 3/26/2013 8:50:44 AM | Construction | NY 3 |
 | Dock Street | NYSDOT - Region 8: roadwork on Dock Street both directions west of River Road (Hyde Park) , Continuous Tuesday December 4th, 2012 12:00 AM thru Tuesday December 31st, 2013 11:59 PM all lanes closed | Dutchess | Hudson Valley Catskill Area | 12/18/2012 10:32:28 AM | Closure Construction | Dock Street |
 | A Line | MTA NYC Transit Subway: due to Weather related equipment problems, both directions A Line shuttle bus service only between Howard Beach-JFK Airport Station (Queens) and Far Rockaway-Mott Avenue Station (Queens) until May 30th when train service will be restored. | Queens | New York City Area | 5/19/2013 10:21:28 PM | Transit Incidents | A Line |
 | NY 425 | NYSDOT: construction work, reduced to one lane on NY 425 in both directions from Tremont Street; Ramp to East Robinson Street until 5:30 PM, 05/24/13 on weekday(s). | Niagara | Niagara Buffalo Area | 5/17/2013 11:12:56 AM | Construction | NY 425 |
 | Bronx-Whitestone Bridge | MTA Bridges & Tunnels: bridge rehabilitation on Bronx-Whitestone Bridge northbound approaching Queens Side (New York) 3rd Avenue exit closed for two years from both Cross Island Parkway and Whitestone Expressway, Continuous Monday January 7th, 2013 10:00 AM thru Wednesday January 7th, 2015 11:59 PM | Queens | New York City Area | 1/7/2013 9:58:12 AM | Construction | Bronx-Whitestone Bridge |
 | NY 119 | NYSDOT - Region 8: roadwork on NY 119 both directions between Knollwood Road; NY 100A (Greenburgh) and Winthrop Avenue (Greenburgh) , Monday May 20th, 2013 thru Thursday May 23rd, 2013 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, right lane closures, Friday May 24th, 2013, 07:00 AM thru 12:00 PM, right lane closures | Westchester | Hudson Valley Catskill Area | 5/18/2013 3:00:54 PM | Construction | NY 119 |
 | Bronx-Whitestone Bridge | MTA Bridges & Tunnels: Long term road construction, construction on Bronx-Whitestone Bridge northbound at Queens Side (New York) exit ramp to 3rd Avenue closed until January 2015 | Queens | New York City Area | 1/9/2013 11:14:33 PM | Construction | Bronx-Whitestone Bridge |
 | I-278 | NYSDOT - Region 11: construction on I-278 both directions between Bradley Avenue (Staten Island) and Clove Road; Ramp (Staten Island) , Monday January 7th, 2013 thru Sunday May 26th, 2013, Monday thru Friday, 11:00 PM thru 05:00 AM, 2 lanes closed, Saturday May 25th, 2013, 12:01 AM thru 07:00 AM, 2 lanes closed, Sunday May 26th, 2013, 12:01 AM thru 08:00 AM, 2 lanes closed | Richmond | New York City Area | 5/19/2013 8:00:13 AM | Construction | I-278 |
 | I-86 | NYSDOT: construction work, reduced to one lane on I-86 in both directions from Exit 20 - NY 417 to Exit 17 - NY 394 West Perimeter Road starting 7:00:00 AM, 1/12/2013 until further notice. | Cattaraugus | Niagara Buffalo Area | 4/25/2013 9:28:59 AM | Construction | I-86 |
 | Lake Ontario State Parkway | NYSDOT: closed for repairs, bridge construction on Lake Ontario State Parkway eastbound from after Manitou Beach Road to before Exit - CR 140 starting 8:00 AM, 01/21/13 until 4:00 PM, 10/18/13. Comment: Eastbound traffic will be diverted to a single lane on Westbound. Westbound traffic will be reducedto a single lane. | Monroe | Finger Lakes Rochester Area | 1/11/2013 2:22:33 PM | Closure Construction | Lake Ontario State Parkway |
 | NY 46 | NYSDOT: lane closures on NY 46 at NY 49 (Verona) | Oneida | Central Syracuse Utica Area | 5/19/2013 3:32:51 PM | Incidents | NY 46 |
 | Lake Ontario State Parkway | NYSDOT: bridge construction on Lake Ontario State Parkway east in the vicinity of Manitou Beach Road closed for repairs until 4:00 P.M. Friday, October 18, 2013. Comment: Eastbound traffic will be diverted to a single lane on Westbound. Westbound traffic will be reducedto a single lane. | Monroe | Finger Lakes Rochester Area | 1/21/2013 12:00:02 AM | Closure Construction | Lake Ontario State Parkway |
 | Ed Koch/Queensboro Bridge | NYSDOT - Region 11: construction on Ed Koch/Queensboro Bridge eastbound into Queens (New York) to facilitate MTA overhead lighting work., Friday April 19th, 2013 thru Sunday June 30th, 2013, Monday thru Friday, 10:00 AM thru 02:00 PM, 1 lane closed south upper roadway, Saturday April 20th, 2013 thru Sunday June 30th, 2013, Saturday/Sunday, 06:00 AM thru 02:00 PM, 1 lane closed south upper roadway | New York | New York City Area | 4/19/2013 2:01:01 PM | Construction | Ed Koch/Queensboro Bridge |
 | H Shuttle | MTA NYC Transit Subway: due to Additional Service, both directions H Shuttle shuttle service only between Far Rockaway - Mott Avenue Station (Far Rockaway) and Beach 90th Street Station (Queens) from 4 a.m. to 11:59 p.m. until further notice Q22 buses provide local service in the Rockaways. | Queens | New York City Area | 5/19/2013 10:22:27 PM | General Information | H Shuttle |
 | Battery Park Underpass | NYSDOT - Region 11: longterm construction on Battery Park Underpass southbound from Route 9A/West Street (New York) to FDR Drive to facilitate the intallation of granite faced precast concrete wall panels., Monday March 4th, 2013 thru Sunday June 30th, 2013, Monday thru Friday, 10:00 PM thru 05:00 AM, all lanes closed, Monday March 4th, 2013 thru Sunday June 30th, 2013, 01:00 AM thru 08:00 AM, all lanes closed | New York | New York City Area | 3/1/2013 10:42:31 AM | Closure Construction | Battery Park Underpass |
 | South Gannon Avenue | NYSDOT - Region 11: construction on South Gannon Avenue eastbound between Stewart Street (Staten Island) and Wooley Avenue (Staten Island) , Continuous Friday March 1st, 2013 12:01 AM thru Friday May 24th, 2013 11:59 PM left lane closed | Richmond | New York City Area | 5/17/2013 5:26:37 PM | Construction | South Gannon Avenue |
 | Hudson Street | NYSDOT - Region 11: longterm construction on Hudson Street between Worth Street (New York) and North Moore Street These Streets will be narrowed to two lanes of traffic to facilitate NYCDDC trunk watermain work., Continuous Monday March 4th, 2013 12:00 AM thru Saturday September 19th, 2015 11:59 PM 2 lanes open | New York | New York City Area | 3/4/2013 1:48:00 PM | Construction | Hudson Street |
 | Chambers Street | NYSDOT - Region 11: construction on Chambers Street westbound between Broadway (New York) and Greenwich Street (New York) These Streets were converted from two-way to a one-way westbound operation, to facilitate major water and sewer utility work and roadway reconstruction by NYCDDC., Continuous Monday March 4th, 2013 12:00 AM thru Tuesday November 4th, 2014 11:59 PM 1 lane open | New York | New York City Area | 3/4/2013 2:28:12 PM | Construction | Chambers Street |
 | NY 9A | NYSDOT - Region 11: construction on NY 9A both directions between Albany Street (New York) and Vesey Street Three lanes of traffic in each direction will be maintained during peak hours. Note: The at-grade pedestrian crossing at Vesey Street is closed. Pedestrians are advised to use Veset Street Bridge or the Murray Street at grade crossing., Continuous Monday March 4th, 2013 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 3 lanes open | New York | New York City Area | 3/4/2013 2:54:33 PM | Construction | NY 9A |
 | South Street | NYSDOT - Region 11: longterm construction on South Street northbound between Whitehall Street (New York) and Old Slip to facilitate NYCEDC installation of a sewer main and new esplanade/bike lane., Continuous Monday March 4th, 2013 12:00 AM thru Wednesday September 4th, 2013 11:59 PM 1 lane open | New York | New York City Area | 3/4/2013 3:22:14 PM | Construction | South Street |
 | John Street | NYSDOT - Region 11: construction on John Street between Broadway (New York) and Nassau Street The roadway will be closed periodically during weekday, to facilitate ongoing building operation., Monday March 4th, 2013 thru Friday May 31st, 2013, Monday thru Friday, 07:00 AM thru 06:00 PM, all lanes closed | New York | New York City Area | 3/4/2013 3:49:10 PM | Closure Construction | John Street |
 | East Houston Street | NYSDOT - Region 11: construction on East Houston Street between Bowery (New York) and Suffolk Street to facilitate NYCDDC roadway reconstruction., Continuous Monday March 4th, 2013 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 2 lanes open | New York | New York City Area | 3/4/2013 3:57:35 PM | Construction | East Houston Street |
 | 2nd Avenue | NYSDOT - Region 11: construction on 2nd Avenue southbound between East 101st Street (New York) and East 93rd Street (New York) To facilitate NYCT 2nd Avenue Subway construction project. On East 96th Street four lanes are maintained, two lanes in each direction. Left turn from westbound 96th Street onto southbound 2nd Avenue are permitted., Monday March 4th, 2013 thru Wednesday July 31st, 2013, Monday thru Friday, 07:00 AM thru 10:00 PM, 4 lanes open, Monday March 4th, 2013 thru Wednesday July 31st, 2013, Monday thru Friday, 03:00 PM thru 07:00 PM, 4 lanes open | New York | New York City Area | 3/5/2013 2:53:41 PM | Construction | 2nd Avenue |
 | NY 28 | NYSDOT: closed to traffic on NY 28 southbound at NY 12 until 4:00 PM, 09/06/13. Comment: NY 28 bridge over NY 12 is closed to traffic. A local detour has been established. Bridge closure has minor impact to traffic. | Oneida | Central Syracuse Utica Area | 3/8/2013 11:50:40 AM | Closure Incidents | NY 28 |
 | I-481 | NYSDOT: bridge construction, reduced to one lane on I-481 northbound at Exit 4 - I-690 starting 9:00 AM, 03/25/13 until 3:00 PM, 07/29/13. Comment: Reduced to one lane 24/7 on I-481 NB bridge over I-690 WB, for bridge deck replacement | Onondaga | Central Syracuse Utica Area | 3/19/2013 2:21:34 PM | Construction | I-481 |
 | 2nd Avenue | NYSDOT - Region 11: construction on 2nd Avenue southbound between East 95th Street (New York) and East 91st Street (New York) to facilitate long term NYCT Second Avenue Subway Construction., Tuesday March 5th, 2013 thru Wednesday July 31st, 2013, Monday thru Friday, 07:00 AM thru 10:00 AM, 4 lanes open, Tuesday March 5th, 2013 thru Wednesday July 31st, 2013, Monday thru Friday, 03:00 PM thru 07:00 PM, 4 lanes open | New York | New York City Area | 3/5/2013 2:50:28 PM | Construction | 2nd Avenue |
 | 2nd Avenue | NYSDOT - Region 11: construction on 2nd Avenue southbound between East 79th Street (New York) and East 78th Street (New York) , Tuesday March 5th, 2013 thru Wednesday July 31st, 2013, Monday thru Friday, 07:00 AM thru 10:00 AM, 4 lanes open, Tuesday March 5th, 2013 thru Wednesday July 31st, 2013, Monday thru Friday, 03:00 PM thru 07:00 PM, 4 lanes open | New York | New York City Area | 3/5/2013 2:56:01 PM | Construction | 2nd Avenue |
 | 2nd Avenue | NYSDOT - Region 11: longterm construction on 2nd Avenue southbound between East 88th Street (New York) and East 82nd Street (New York) to facilitate NYCT Second Avenue Subway Project., Tuesday March 5th, 2013 thru Tuesday September 30th, 2014, Monday thru Friday, 07:00 AM thru 10:00 AM, 4 lanes open, Tuesday March 5th, 2013 thru Tuesday September 30th, 2014, Monday thru Friday, 03:00 PM thru 07:00 PM, 4 lanes open | New York | New York City Area | 3/5/2013 2:59:23 PM | Construction | 2nd Avenue |
 | 2nd Avenue | NYSDOT - Region 11: construction on 2nd Avenue southbound between East 74th Street (New York) and East 66th Street (New York) to facilitate 2nd Avenue Subway Construction., Tuesday March 5th, 2013 thru Thursday October 31st, 2013, Monday thru Friday, 07:00 AM thru 10:00 AM, 4 lanes open, Tuesday March 5th, 2013 thru Thursday October 31st, 2013, Sunday thru Saturday, 03:00 PM thru 07:00 PM, 4 lanes open | New York | New York City Area | 3/5/2013 3:05:06 PM | Construction | 2nd Avenue |
 | Ninth Avenue | NYSDOT - Region 11: construction on Ninth Avenue southbound between West 51st Street (New York) and West 47th Street Bike lane is open. This work is to facilitate NYCDDC water main installation., Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 3 lanes open | New York | New York City Area | 3/6/2013 11:28:51 AM | Construction | Ninth Avenue |
 | 10th Avenue | NYSDOT - Region 11: construction on 10th Avenue between West 29th Street (New York) and West 32nd Street (Vicinity os the 30th Street Entrance to the Lincoln Tunnel) to facilitate NYCDDC contractor's test pit and water main installation project., Continuous Tuesday March 5th, 2013 12:00 AM thru Saturday June 15th, 2013 11:59 PM 3 lanes open | New York | New York City Area | 3/5/2013 3:16:07 PM | Construction | 10th Avenue |
 | 11th Avenue | NYSDOT - Region 11: construction on 11th Avenue between West 26th Street (New York) and West 25th Street (New York) to facilitate NYCT seven line extension roadway and building construction activity., Continuous Tuesday March 5th, 2013 12:00 AM thru Sunday August 31st, 2014 11:59 PM 3 lanes open | New York | New York City Area | 3/5/2013 3:23:40 PM | Construction | 11th Avenue |
 | West 30th Street | NYSDOT - Region 11: longterm construction on West 30th Street between 11th Avenue (New York) and 10th Avenue (New York) to facilitate NYCDDC contractor's test pit and water main installation project, Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday June 30th, 2015 11:59 PM 1 lane open | New York | New York City Area | 3/5/2013 3:27:43 PM | Construction | West 30th Street |
 | West 34th Street | NYSDOT - Region 11: construction on West 34th Street westbound between 10th Avenue (New York) and 11th Avenue 1 Lane will be open eastbound to facilitate NYCEDC roadway reconstruction., Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 2 lanes open | New York | New York City Area | 3/5/2013 3:31:13 PM | Construction | West 34th Street |
 | East 50th Street | NYSDOT - Region 11: construction on East 50th Street between madison Avenue (New York) and Park Avenue (Other times 1 Lane of traffic will be open). To facilitate MTA east side access capital construction project., Tuesday March 5th, 2013 thru Saturday August 31st, 2013, Monday thru Friday, 07:00 AM thru 08:00 PM, 2 lanes open | New York | New York City Area | 3/5/2013 3:36:01 PM | Construction | East 50th Street |
 | West 60th Street | NYSDOT - Region 11: construction on West 60th Street between Columbus Avenue (New York) and Amsterdam Avenue to facilitate NYCDDC major capital water main installation., Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday June 30th, 2015 11:59 PM 1 lane open | New York | New York City Area | 3/5/2013 3:41:47 PM | Construction | West 60th Street |
 | East 63rd Street | NYSDOT - Region 11: construction on East 63rd Street between 3rd Avenue (New York) and Park Avenue to facilitate NYCT 63rd Street Station construction related to the 2nd Avenue Subway project., Tuesday March 5th, 2013 thru Saturday May 31st, 2014, Sunday thru Saturday, 03:00 PM thru 07:00 PM, 1 lane open, Tuesday March 5th, 2013 thru Saturday May 31st, 2014, Sunday thru Saturday, 06:00 AM thru 10:00 AM, 2 lanes open | New York | New York City Area | 3/5/2013 3:49:39 PM | Construction | East 63rd Street |
 | Columbus Avenue | NYSDOT - Region 11: longterm construction on Columbus Avenue between West 65th Street (New York) and West 60th Street to facilitate NYCDDC major capital water main installation., Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday June 30th, 2015 11:59 PM 2 lanes open | New York | New York City Area | 3/5/2013 4:04:49 PM | Construction | Columbus Avenue |
 | Broadway | NYSDOT - Region 11: longterm construction on Broadway southbound between West 65th Street (New York) and West 63rd Street to facilitate NYCDDC major capital water main installation., Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday June 30th, 2015 11:59 PM 2 lanes open | New York | New York City Area | 3/5/2013 4:09:09 PM | Construction | Broadway |
 | Goulden Avenue | NYSDOT - Region 11: construction on Goulden Avenue both directions between Sedgwick Avenue (New York) and 205th Street to facilitate NYCDEP water main project., Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday June 30th, 2015 11:59 PM 1 lane open | Bronx | New York City Area | 3/5/2013 4:29:43 PM | Construction | Goulden Avenue |
 | Claremont Parkway Bridge | NYSDOT - Region 11: bridge work on Claremont Parkway Bridge both directions between Brook Avenue (New York) and Washington Avenue , Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 1 lane open | Bronx | New York City Area | 3/5/2013 4:33:38 PM | Construction | Claremont Parkway Bridge |
 | Palisades Avenue | NYSDOT - Region 11: construction on Palisades Avenue at Independence Avenue (New York) to facilitate NYCDDC retaining wall reconstruction. Motorists should follow posted detour route., Continuous Tuesday March 5th, 2013 12:00 AM thru Sunday June 30th, 2013 11:59 PM all lanes closed | Bronx | New York City Area | 3/5/2013 5:05:03 PM | Closure Construction | Palisades Avenue |
 | Belt System - Shore Parkway | NYSDOT - Region 11: longterm construction on Belt System - Shore Parkway both directions over Fresh Creek Basin Bridge (New York) to facilitate NYCDOT bridge reconstruction., Tuesday March 5th, 2013 thru Friday October 31st, 2014, Monday thru Friday, 10:00 AM thru 02:00 PM, 1 lane closed, Tuesday March 5th, 2013 thru Friday October 31st, 2014, Monday thru Friday, 10:00 PM thru 05:00 AM, 1 lane closed, Tuesday March 5th, 2013 thru Friday October 31st, 2014, Monday thru Friday, 01:00 AM thru 05:00 AM, 2 lanes closed | Kings | New York City Area | 3/5/2013 5:49:15 PM | Construction | Belt System - Shore Parkway |
 | Belt System - Shore Parkway | NYSDOT - Region 11: construction on Belt System - Shore Parkway both directions over Paerdegat Basin Bridge (New York) to facilitate NYCDOT bridge reconstruction., Tuesday March 5th, 2013 thru Friday October 31st, 2014, Monday thru Friday, 10:00 AM thru 02:00 PM, 1 lane closed, Tuesday March 5th, 2013 thru Friday October 31st, 2014, Monday thru Friday, 10:00 PM thru 05:00 AM, 1 lane closed, Wednesday March 6th, 2013 thru Friday October 31st, 2014, Monday thru Friday, 01:00 AM thru 05:00 AM, 2 lanes closed | Kings | New York City Area | 3/5/2013 5:53:39 PM | Construction | Belt System - Shore Parkway |
 | Nassau Avenue | NYSDOT - Region 11: construction on Nassau Avenue between Manhattan Avenue (New York) and Apollo Street to facilitate NYCDDC roadway reconstruction project., Continuous Tuesday March 5th, 2013 12:00 AM thru Saturday August 31st, 2013 11:59 PM 1 lane open | Kings | New York City Area | 3/5/2013 5:56:38 PM | Construction | Nassau Avenue |
 | 149th Street Bridge | NYSDOT - Region 11: bridge rehabilitation on 149th Street Bridge both directions between 41st Avenue (New York) and Roosevelt Avenue , Continuous Tuesday March 5th, 2013 12:00 AM thru Sunday June 30th, 2013 11:59 PM all lanes closed | Queens | New York City Area | 3/5/2013 6:17:50 PM | Closure Construction | 149th Street Bridge |
 | Narrows Road South | NYSDOT - Region 11: construction on Narrows Road South eastbound from Fingerboard Road (Staten Island) to Verrazano Narrows Bridge Entrance Ramp to facilitate MTA construction of a fly over ramp, Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday December 31st, 2013 11:59 PM 2 lanes open | Richmond | New York City Area | 3/5/2013 6:28:53 PM | Construction | Narrows Road South |
 | M Line | MTA NYC Transit Subway: due to Construction, both directions M Line bypassing Central Avenue Station (Brooklyn) , Continuous Monday March 11th, 2013 12:01 AM thru Saturday August 31st, 2013 11:59 PM , | Kings | New York City Area | 3/6/2013 10:56:49 AM | Transit Construction | M Line |
 | I-88 | NYSDOT: major road construction, reduced to one lane on I-88 eastbound from Town of Fenton; Town of Colesville Line to NY 7 until 4:00 PM, 09/30/13. Comment: There is a speed reduction in this work zone. | Broome | Southern Tier Homell Elmira Binghamton Area | 5/10/2013 11:26:08 AM | Construction | I-88 |
 | CTY TRM Zone Branch | MTA Long Island Rail Road: due to Track work, eastbound CTY TRM Zone Branch between Jamaica Station (Queens) and Queens Village (Queens) customers should plan for up to 25 mins of additional travel time. Plus buses depart 27 mins earlier than normal train time., Continuous Friday May 17th, 2013 11:06 PM thru Monday May 20th, 2013 3:54 AM , shuttle bus service only | Queens | New York City Area | 5/15/2013 6:36:09 PM | Transit Construction | CTY TRM Zone Branch |
 | NY 26 | NYSDOT: closed to traffic on NY 26 northbound at NY 69; NY 49 due to bridge maintenance operations until 5:00 PM, 09/27/13. Comment: NY 26 north bridge over NY 365 west will close to traffic on March 12 for bridge deck rehabilitation. A signed detour is in place. | Oneida | Central Syracuse Utica Area | 3/8/2013 1:28:58 PM | Closure Incidents | NY 26 |
 | NY 69 | NYSDOT: closed to traffic on NY 69 eastbound at NY 365 due to bridge maintenance operations until 5:00 PM, 09/27/13. Comment: NY 49/69 east bridge over NY 365 west and NY 49/69 east bridge over NY 26 north will close March 12 due bridge rehabilitation. A signed detour is in place. | Oneida | Central Syracuse Utica Area | 3/8/2013 1:34:37 PM | Closure Incidents | NY 69 |
 | Grand Central Terminal | MTA Metro-North Railroad: due to Construction Grand Central Terminal Manhattan (Manhattan) - both escalators from the lower level (west side of the Terminal) to the North End Access will be out of service until further notice. Customers can use the elevators across from the escalators, the stairs or detour through the Main Concourse via the South end of the platform. | New York | New York City Area | 5/19/2013 10:24:05 PM | Transit Construction | Grand Central Terminal |
 | M Line | MTA NYC Transit Subway: due to Construction( Construction), both directions M Line bypassing Central Avenue Station (Brooklyn) until 11:59 P.M., August 31, 2013 | Kings | New York City Area | 5/19/2013 2:01:27 AM | Transit Construction | M Line |
 | Sprain Brook State Parkway | NYSDOT - Region 8: roadwork on Sprain Brook State Parkway northbound between Dobbs Ferry Road; NY 100B (Greenburgh) and Exit - Grasslands Road; NY 100C (Greenburgh) , Monday May 20th, 2013 thru Friday May 24th, 2013 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 PM thru 07:00 AM, various lane closures | Westchester | Hudson Valley Catskill Area | 5/19/2013 7:01:04 AM | Construction | Sprain Brook State Parkway |
 | Sprain Brook State Parkway | NYSDOT - Region 8: roadwork on Sprain Brook State Parkway southbound between Exit - Grasslands Road; NY 100C (Greenburgh) and Dobbs Ferry Road; NY 100B (Greenburgh) , Monday May 20th, 2013 thru Friday May 24th, 2013 Monday/ Tuesday/ Wednesday/ Thursday, 06:00 PM thru 07:00 AM, various lane closures | Westchester | Hudson Valley Catskill Area | 5/19/2013 7:01:03 AM | Construction | Sprain Brook State Parkway |
 | NY 31 | NYSDOT: bridge construction, closed ahead on NY 31 at South Wayneport Road; CR 206 until 5:00 PM, 06/28/13. Comment: The North Wayneport Rd. bridge over the Erie Canal is closed for repairs. the bridge is .72 milesnorth of NY Rt. 31. Detour is posted. | Wayne | Finger Lakes Rochester Area | 3/11/2013 12:31:08 PM | Closure Construction | NY 31 |
 | I-390 | NYSDOT: road construction, reduced to one lane on I-390 northbound from West Henrietta Road; NY 15 to Exit 11 - NY 251; Ramp starting 8:00 AM, 03/20/13 starting 8:00:00 AM, 3/20/2013 until further notice. Comment: Concrete pavement repairs will have a single lane closure in effect until further notice. | Monroe | Finger Lakes Rochester Area | 3/13/2013 2:46:10 PM | Construction | I-390 |
 | I-87 Northway | NYSDOT: bridge construction, reduced to one lane on I-87 Northway in both directions at Exit 26; US 9 starting 7:00:00 AM, 3/18/2013 until further notice. Comment: Southbound traffic will remain on I-87 south in the right lane and northbound traffic will be shifted from I-87 northbound left lane to I-87 southbound left lane. Use Caution. | Warren | Adirondack Watertown Plattsburgh Area | 4/4/2013 12:17:46 PM | Construction | I-87 Northway |
 | High Bridge | NYSDOT - Region 11: construction on High Bridge both directions from Undercliff Avenue (New York) to Depot Place Installation of safety materials.. NYCDDC, Continuous Friday March 15th, 2013 12:00 AM thru Saturday June 15th, 2013 11:59 PM 1 lane closed | Bronx | New York City Area | 3/15/2013 1:08:05 PM | Construction | High Bridge |
 | Hudson Street | NYSDOT - Region 11: construction on Hudson Street between West Houston Street (New York) and Clarkson Street to facilitate NYCDDC water main project. Additionally on lane of traffic is maintained on West Houston Street and Carkson Street off peak hours overnight and weekends., Continuous Friday March 15th, 2013 12:00 AM thru Sunday June 30th, 2013 11:59 PM 1 lanes open | New York | New York City Area | 3/15/2013 4:27:14 PM | Construction | Hudson Street |
 | 7th Avenue | NYSDOT - Region 11: construction on 7th Avenue between West 42nd Street (New York) and West 47th Street (New York) to facilitate Con Edison utility work. On nightly basis work is confined to the specific ares within the above limits of 7th Avenue., Friday March 15th, 2013 thru Tuesday December 31st, 2013 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 08:00 AM, 2 lanes open, Friday March 15th, 2013 thru Tuesday December 31st, 2013, Saturday/Sunday, 01:00 AM thru 12:01 PM, 2 lanes closed | New York | New York City Area | 3/15/2013 4:43:11 PM | Construction | 7th Avenue |
 | East 55th Street | NYSDOT - Region 11: Construction on East 55th Street between Madison Avenue and Park Avenue, Continuous Friday March 15th, 2013 12:00 AM thru Saturday November 30th, 2013 11:59 PM, Entire Week, 1 lane open | New York | New York City Area | 4/16/2013 2:22:14 AM | Construction | East 55th Street |
 | NY 17 | NYSDOT: bridge construction, reduced to one lane on NY 17 eastbound at Exit 62 - NY 282 starting 7:06 AM, 03/18/13 until 5:00 PM, 07/03/13. Comment: Exit 62 off ramp to remain open | Tioga | Southern Tier Homell Elmira Binghamton Area | 3/17/2013 3:09:38 PM | Construction | NY 17 |
 | NY 22 | NYSDOT - Region 8: roadwork on NY 22 northbound between Sodom Road (Southeast) and Milltown Road (Southeast) , Monday May 20th, 2013 thru Thursday May 23rd, 2013 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, alternate lanes closures | Putnam | Hudson Valley Catskill Area | 5/17/2013 4:30:08 PM | Construction | NY 22 |
 | NY 17 | NYSDOT: long term road construction on NY 17 in both directions at Town of Windsor; Town of Sanford Line until 6:00 PM, 06/01/13. Comment: There will be periordic lane closures on SR 17 eastbound and SR 17 westbound | Broome | Southern Tier Homell Elmira Binghamton Area | 3/21/2013 10:43:11 AM | Construction | NY 17 |
 | NY 17 | NYSDOT: bridge construction, single line traffic alternating directions on NY 17 in both directions at Exit 94 - Stewart Brook Road; NY 206 until 6:00 PM, 09/30/13. | Sullivan | Hudson Valley Catskill Area | 3/21/2013 10:41:54 AM | Construction | NY 17 |
 | US 11 | NYSDOT: long term road construction on US 11 both directions between Exit - Front Street; Ramp (Binghamton) and I-81 Southbound (Binghamton) | Broome | Southern Tier Homell Elmira Binghamton Area | 5/19/2013 3:32:20 PM | Construction | US 11 |
 | Adirondack Northway Extension | NYSDOT: road construction and truck restriction on Adirondack Northway Extension north at City of Albany; Town of Guilderland Line (Albany) width limit | Albany | Capital Region Albany Saratoga Area | 5/19/2013 3:32:56 PM | Construction | Adirondack Northway Extension |
 | Walden Avenue | NYSDOT: construction work, paving operations, single line traffic alternating directions on Walden Avenue in both directions from Quail Run Lane to Town of Lancaster; Town of Alden Line until 5:30 PM, 05/25/13 on weekday(s). | Erie | Niagara Buffalo Area | 5/16/2013 11:54:58 AM | Construction | Walden Avenue |
 | NY 17 | NYSDOT: long term road construction, reduced to two lanes on NY 17 in both directions from Exit 72 - US 11 to Exit 71 - CR 69 until 5:00 PM, 12/31/13. Comment: Current three lanes will be reduced to two lanes. Reduced speed in work zone. "Starting April 22, traffic patterns will be changing on NY 17 and I-81. Expect slow moving traffic and delays.Local commuters should consider alternate routes to and from Binghamton. For more info go to www.facebook.com/Prospect Mountain.Project" | Broome | Southern Tier Homell Elmira Binghamton Area | 4/16/2013 10:15:22 AM | Construction | NY 17 |
 | NY 104 | NYSDOT: right shoulder closed on NY 104 eastbound at Town of Irondequoit and Town of Webster Line due to construction work until 3:00 PM, 08/31/13. Comment: Rte 104 EB just west of Irondequoit Bay Bridge LONG TERM RIGHT SHOULDER CLOSURE until AUG 31, 2013. ALL LANES OPEN TO TRAFFIC | Monroe | Finger Lakes Rochester Area | 3/25/2013 1:21:38 PM | Incidents | NY 104 |
 | Asser Levy Place | NYSDOT - Region 11: construction on Asser Levy Place northbound between East 23rd Street (New York) and East 25th Street This Street will be converted to one-way northbound to facilitate NYCDDC roadway work. This work is scheduled to commence April 1st, 2013., Continuous Monday April 1st, 2013 12:00 AM thru Tuesday December 31st, 2013 11:59 PM all lanes open | New York | New York City Area | 3/26/2013 2:32:51 PM | Construction | Asser Levy Place |
 | Sedgwick Avenue | NYSDOT - Region 11: construction on Sedgwick Avenue both directions between Depot Place (New York) and Undercliff Avenue to facilitate the rehabilitation of the High Bridge by NYCDDC, Continuous Tuesday March 26th, 2013 12:00 AM thru Sunday June 30th, 2013 11:59 PM 1 lane closed | Bronx | New York City Area | 3/26/2013 2:36:46 PM | Construction | Sedgwick Avenue |
 | NY 38 | NYSDOT: bridge construction, single line traffic alternating directions, temporary traffic lights on NY 38 between I-90 and Town of Conquest; Town of Mentz Line starting 7:00 AM, 04/08/13 until 12:00 PM, 06/10/13. | Cayuga | Finger Lakes Rochester Area | 4/3/2013 2:15:12 PM | Construction | NY 38 |
 | NY 400 | NYSDOT: construction work, right lane closed, reduced to one lane on NY 400 in both directions from Exit - Old NY 16 from (NY 16/NY 400 to NY 16) Ramp to East Main Street; US 20A starting 7:30:00 AM, 4/1/2013 until further notice. Comment: Workzone is between Lapham and Blakeley Corners Roads. | Erie | Niagara Buffalo Area | 5/16/2013 11:51:53 AM | Construction | NY 400 |
 | Stone Street | NYC DOT: street fair on Stone Street between Broad Street (Manhattan)and Hanover Square (Manhattan) Stone Street Pedestrian Mall, Monday April 1st, 2013 thru Saturday November 30th, 2013, Sunday thru Saturday, 11:00 AM thru 06:00 PM, all lanes closed | New York | New York City Area | 3/28/2013 8:47:45 AM | Closure Special Events | Stone Street |
 | US 9 | NYSDOT: road construction on US 9 northbound at Latham Circle; Troy Schenectady Road; NY 2 -- right exit ramp starting 8:00 AM, 04/02/13 starting 8:00:00 AM, 4/2/2013 until further notice. Comment: The Rte 9 northbound ramp to Rte 2 will have a lane shift 24/7. There will be a concrete barrier on the left side and is expected to be in place for several months. The lane width will be restricted to 10 feet | Albany | Capital Region Albany Saratoga Area | 3/28/2013 8:59:46 AM | Construction | US 9 |
 | I-490 | NYSDOT: left lane closed on I-490 westbound from Exit 7B - NY 531 to Buffalo Road; Ramp due to long term road construction starting 2:00 PM, 04/01/13 starting 2:00:00 PM, 4/1/2013 until further notice. Comment: There is going to be a long term left lane closure on I-490 WB between Rt. 531 and Buffalo Road for theplacement of concrete barrier down the centerline of I-490 WB. I-490 WB will then be reduced to one lane whenapproaching the Rt. 204 overpass. | Monroe | Finger Lakes Rochester Area | 4/1/2013 7:59:18 AM | Construction | I-490 |
 | NY 17 | NYSDOT: long term road construction, reduced to one lane, width limit on NY 17 in both directions from Exit 99 - North Main Street to Exit 100 - NY 52 East starting 7:00 AM, 04/01/13 until 5:00 PM, 07/15/13. Comment: Width limit is 18 feet | Sullivan | Hudson Valley Catskill Area | 3/31/2013 3:02:05 PM | Construction | NY 17 |
 | NY 12 | NYSDOT: long term road construction, reduced to one lane on NY 12 in both directions from Chenango; Broome County Line to Town of Oxford; Town of Greene Line starting 7:00 AM, 04/01/13 until 4:00 PM, 11/29/13. Comment: Single lane traffic during work hours - will be maintained by flaggers | Broome | Southern Tier Homell Elmira Binghamton Area | 3/31/2013 3:39:37 PM | Construction | NY 12 |
 | NY 17 | NYSDOT: exit ramp closed on NY 17 westbound at Exit 100 - NY 52 East due to bridge construction starting 7:00 AM, 04/02/13 until 4:00 PM, 06/28/13. Comment: Traffic detoured to Exit 101 | Sullivan | Hudson Valley Catskill Area | 3/31/2013 3:51:41 PM | Closure Construction | NY 17 |
 | NY 23 | NYSDOT: long term road construction and single line traffic alternating directions on NY 23 both directions at NY 30 Grand Gorge (Roxbury) | Delaware | Hudson Valley Catskill Area | 5/19/2013 3:32:25 PM | Construction | NY 23 |
 | I-81 | NYSDOT: bridge construction, reduced to one lane on I-81 in both directions from Cedarhurst Road; CR 20 to Exit 2E - Connector from US 11 to I-81 (Exit 2) & NY 17 (Exit 75) until 6:00 PM, 05/24/13. Comment: Work is from Ostrum Road to Trim Street ( MM 1068 - 1057) | Broome | Southern Tier Homell Elmira Binghamton Area | 4/14/2013 6:36:44 PM | Construction | I-81 |
 | NY 2 | NYSDOT: bridge construction, reduced to one lane on NY 2 in both directions at Congress Street Bridge; Albany-Rensselaer County Line starting 1:00:00 PM, 4/1/2013 until further notice. Comment: Rte 2 E/W on the Congress Street will be reduced to one lane in each direction. This is a 24/7 Lane Reduction. No Trucks are allowed on the Bridge Westbound due to width restrictions. Trucks traveling EB from Watervliet are permitted on the bridge.Trucks traveling west on Rte 2 through the City of Troy will be detoured via a signed detour-Truck Detour Route- 6th Ave to Federal St, then crossing the Green Island Bridge, and then using Albany Ave and 25th St to 2nd Ave in Watervliet to rejoin rte 2 to continue West. | Albany | Capital Region Albany Saratoga Area | 4/8/2013 3:07:24 PM | Construction | NY 2 |
 | Dover Furnace Road | NYSDOT - Region 8: roadwork on Dover Furnace Road both directions Ore Bed Road (Dover Plains) to Vincent Road (Dover Plains) , Continuous Monday April 1st, 2013 2:42 PM thru Monday September 30th, 2013 11:59 PM all lanes closed | Dutchess | Hudson Valley Catskill Area | 4/1/2013 2:42:58 PM | Closure Construction | Dover Furnace Road |
 | NY 17 | NYSDOT: closures on NY 17 west at Exit 100 - NY 52 East (Liberty) exit ramp closed until 4:00 P.M. Friday, June 28, 2013. Comment: Traffic detoured to Exit 101 | Sullivan | Hudson Valley Catskill Area | 4/2/2013 6:46:06 AM | Closure Construction | NY 17 |
 | NY 14A | NYSDOT: closed ahead on NY 14A northbound at NY 14 due to bridge construction starting 7:57 AM, 04/04/13 until 6:00 PM, 08/15/13. Comment: Bridge replacement. On site detour with flaggers present. | Schuyler | Southern Tier Homell Elmira Binghamton Area | 4/3/2013 8:10:18 AM | Closure Construction | NY 14A |
 | NY 14A | NYSDOT: closures on NY 14A north at NY 14 (Reading) closed ahead until 6:00 P.M. Thursday, August 15, 2013. Comment: Bridge replacement. On site detour with flaggers present. | Schuyler | Southern Tier Homell Elmira Binghamton Area | 4/3/2013 7:42:47 AM | Closure Construction | NY 14A |
 | NY 29 | NYSDOT: bridge maintenance operations, single line traffic alternating directions on NY 29 in both directions at Town of Salem; Town of Greenwich Line starting 7:00:00 AM, 4/4/2013 until further notice. Comment: Alternating one way traffic controlled by a temporary traffic signal until further notice. | Washington | Capital Region Albany Saratoga Area | 4/4/2013 7:34:45 AM | Construction | NY 29 |
 | Franklin D. Roosevelt Drive | NYSDOT - Region 11: construction on Franklin D. Roosevelt Drive both directions between East 79th Street (New York) and East 91st Street to facilitate NYCDOT bridges overhead promanade work., Monday April 1st, 2013 thru Thursday June 20th, 2013 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:30 AM, 1 lane closed, Saturday April 6th, 2013 thru Thursday June 20th, 2013, 12:01 AM thru 06:30 AM, 1 lane closed, Tuesday April 2nd, 2013 thru Thursday June 20th, 2013 Tuesday/ Wednesday/ Thursday, 01:00 AM thru 05:00 AM, 2 lanes closed, Saturday April 6th, 2013 thru Thursday June 20th, 2013, 02:00 AM thru 06:00 AM, 2 lanes closed | New York | New York City Area | 4/4/2013 1:24:19 PM | Construction | Franklin D. Roosevelt Drive |
 | NY 277 | NYSDOT: construction work, reduced to one lane on NY 277 in both directions at NY 33 starting 7:00:00 AM, 4/8/2013 until further notice. Comment: No left turn from Northbound Route 277 onto Westbound Route 33 entrance ramp. No left turn from Route 33 exit ramp onto Route 277. Truck traffic is restricted on both entrance & entrance ramps, follow posted detour. | Erie | Niagara Buffalo Area | 5/16/2013 11:36:08 AM | Construction | NY 277 |
 | Wassaic Extension | MTA Metro-North Railroad: due to Construction, both directions Wassaic Extension into/out of Wassaic Station (Wassaic) . The bus schedule is included in the April 7th Harlem Line timetable., Sunday April 7th, 2013 thru Sunday June 2nd, 2013, 08:00 AM thru 03:00 PM, bus service only, Sunday April 7th, 2013 thru Sunday June 2nd, 2013, Monday thru Friday, 09:00 AM thru 05:00 PM, bus service only | Dutchess | Hudson Valley Catskill Area | 4/8/2013 7:07:00 PM | Transit Construction | Wassaic Extension |
 | NY 17 | NYSDOT: bridge construction, reduced to one lane, width limit on NY 17 in both directions from Town of Colchester; Town of Rockland Line to Exit 94 - Stewart Brook Road; NY 206 starting 7:09 AM, 04/08/13 until 5:30 PM, 07/30/13. Comment: Width restriction is both eastbound and westbound | Sullivan | Hudson Valley Catskill Area | 4/7/2013 4:14:36 PM | Construction | NY 17 |
 | NY 17C | NYSDOT: road construction on NY 17C both directions between Valley View Drive (Owego) and Town of Owego; Town of Union Line (Union) | Tioga | Southern Tier Homell Elmira Binghamton Area | 5/19/2013 3:32:46 PM | Construction | NY 17C |
 | NY 17 | NYSDOT: bridge construction, reduced to one lane on NY 17 in both directions from Exit 83 - CR 28 to Exit 84 - NY 17 (Exit 84) connector to NY 8/NY 10 starting 7:00 AM, 04/10/13 until 4:00 PM, 11/29/13. | Broome | Southern Tier Homell Elmira Binghamton Area | 4/7/2013 6:42:59 PM | Construction | NY 17 |
 | NY 145 | NYSDOT: single line traffic alternating directions, temporary traffic lights on NY 145 in both directions at Town of Durham; Town of Cairo Line due to road construction until 3:30 PM, 05/31/13. Comment: There will be alternating one way traffic between Freehold Ford Rd and Jennings Rd in the town of Durham 24/7 | Greene | Hudson Valley Catskill Area | 4/8/2013 3:41:30 PM | Construction | NY 145 |
 | NY 17 | NYSDOT: long term road construction on NY 17 westbound from Exit 58 - Lowman Crossover; Ramp to Exit 59 - NY 427; Ramp starting 7:00 AM, 04/09/13 until 5:30 PM, 11/15/13. Comment: Lane closed for bridge work | Chemung | Southern Tier Homell Elmira Binghamton Area | 4/8/2013 10:58:59 PM | Construction | NY 17 |
 | NY 370 | NYSDOT: race event, closed to traffic on NY 370 in both directions from Old Liverpool Road to Onondaga Lake Parkway starting 12:00 PM, 06/18/13 until 9:30 PM, 06/18/13 on Tuesday(s). Comment: JP Morgan Chase Bank -- Corprate Challenge | Onondaga | Central Syracuse Utica Area | 4/9/2013 9:14:07 AM | Closure Special Events | NY 370 |
 | NY 370 | NYSDOT: major event, closed to traffic on NY 370 in both directions from Old Liverpool Road to City of Syracuse; Town of Salina Line starting 8:00 AM, 07/07/13 until 12:00 PM, 08/25/13 on Sunday(s). Comment: Parkway Sundays | Onondaga | Central Syracuse Utica Area | 4/9/2013 9:21:18 AM | Closure Special Events | NY 370 |
 | NY 370 | NYSDOT: major event, show, fireworks display, closed to traffic on NY 370 in both directions from Old Liverpool Road to City of Syracuse; Town of Salina Line starting 4:00 PM, 12/31/13 until 2:00 AM, 01/01/14 on Tuesday(s) and Wednesday(s). Comment: First Night | Onondaga | Central Syracuse Utica Area | 4/9/2013 9:25:19 AM | Closure Special Events | NY 370 |
 | I-490 | NYSDOT: closed to traffic, bridge construction on I-490 eastbound at Chili Center Coldwater Road; NY 386 starting 9:08 AM, 04/10/13 starting 9:08:00 AM, 4/10/2013 until further notice. Comment: I 490 EB from Paul Rd. to exit ramp to NY 386 will have the right lane open for traffic to exit onto NY 386. | Monroe | Finger Lakes Rochester Area | 4/9/2013 1:11:39 PM | Closure Construction | I-490 |
 | I-490 | NYSDOT: closed to traffic, bridge construction on I-490 eastbound from Paul Road; CR 168 to Exit 7A - NY 33 starting 9:11:00 AM, 4/9/2013 until further notice. Comment: I 490 EB will be closed to traffic and diverted to I 490 WB. I 490 EB will have a right lane open for access to Exit 5 (NY 386) and a crossover east of Exit 5 for access to Exit 6 (NY 204) | Monroe | Finger Lakes Rochester Area | 4/9/2013 1:19:18 PM | Closure Construction | I-490 |
 | NY 7 | NYSDOT: road construction on NY 7 in both directions at Town of Princetown; Town of Duanesburg Line starting 7:00 AM, 04/22/13 starting 7:00:00 AM, 4/22/2013 until further notice. Comment: This roadwork will take place on Birchwood Drive in the town of Duanesburg. Birchwood Drive will be closed at both ends of the bridge over I-88. All lanes on Rte 7 will remain open, | Schenectady | Capital Region Albany Saratoga Area | 4/9/2013 1:19:45 PM | Construction | NY 7 |
 | I-390 | NYSDOT: road construction, reduced to one lane on I-390 southbound from Exit 11 - NY 251; Ramp to Honeoye Falls No. 6; CR 63 until 5:00 PM, 08/30/13. Comment: Concrete pavement repairs will have a right lane closure in place then a left lane closure in place. | Monroe | Finger Lakes Rochester Area | 4/9/2013 3:25:47 PM | Construction | I-390 |
 | NY 77 | NYSDOT: road construction, single line traffic alternating directions on NY 77 from West Main Street; NY 33; East Main Street to Broadway; US 20 starting 7:00 AM, 04/10/13 until 5:30 PM, 06/30/13 on weekday(s). | Genesee | Niagara Buffalo Area | 4/9/2013 3:28:08 PM | Construction | NY 77 |
 | NY 427 | NYSDOT: reduced to one lane, single line traffic alternating directions on NY 427 in both directions from Town of Chemung; Town of Ashland Line to Exit 59 - Clark Road; END ROUTE due to construction work until 7:00 PM, 11/30/13. Comment: Bridge Deck - temporary traffic signals in place, 1 lane traffic alternating directions | Chemung | Southern Tier Homell Elmira Binghamton Area | 4/10/2013 2:19:33 PM | Construction | NY 427 |
 | NY 2 | NYSDOT: road construction on NY 2 eastbound at Latham Circle; US 9 starting 7:00:00 AM, 4/11/2013 until further notice. Comment: The ramp from Rte 2 eastbound to Rte 9 will have a lane shift for several months. The lane width will be reduced to 10 feet | Albany | Capital Region Albany Saratoga Area | 4/13/2013 2:17:44 PM | Construction | NY 2 |
 | NY 33 | NYSDOT: construction work, single line traffic alternating directions on NY 33 in both directions from Walden Avenue to Genesee and Erie County Line -- look out for flagger until 5:00 PM, 05/24/13 on weekday(s). | Erie | Niagara Buffalo Area | 5/17/2013 11:14:20 AM | Construction | NY 33 |
 | LaSalle Expressway | NYSDOT: construction work, reduced to one lane on LaSalle Expressway in both directions at 87th Street until 5:30 PM, 05/24/13. | Niagara | Niagara Buffalo Area | 5/17/2013 11:11:05 AM | Construction | LaSalle Expressway |
 | A Line | MTA NYC Transit Subway: due to Construction, both directions A Line between Howard Beach-JFK Airport Station (Queens) and 207th Street-Inwood Station (Manhattan) service operates in two sections with a transfer at 168th Street Station, Tuesday May 14th, 2013 thru Friday May 24th, 2013 Tuesday/ Wednesday/ Thursday/ Friday, 12:01 AM thru 05:00 AM, | Queens | New York City Area | 5/14/2013 8:27:10 AM | Transit Construction | A Line |
 | G Line | MTA NYC Transit Subway: due to Construction, both directions G Line between Hoyt-Schermerhorn Station (Brooklyn) and Church Avenue Station (Brooklyn) , Monday May 13th, 2013 thru Friday May 24th, 2013 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, service suspended, Continuous Friday May 17th, 2013 11:00 PM thru Monday May 20th, 2013 5:00 AM , service suspended | Kings | New York City Area | 5/15/2013 8:50:53 PM | Transit Construction | G Line |
 | 86th Street | NYSDOT - Region 11: construction on 86th Street between 1st Avenue (New York) and 2nd Avenue Two lanes eastbound and one lane westbound with no left turns permitted westbound on East 86th Street to southbound 2nd Avenue., Continuous Wednesday April 10th, 2013 12:00 AM thru Tuesday September 30th, 2014 11:59 PM 3 lanes open | New York | New York City Area | 4/10/2013 4:55:29 PM | Construction | 86th Street |
 | NY 17 | NYSDOT: entrance ramp closed on NY 17 westbound at Exit 100 - NY 52 East until 4:00 PM, 09/30/13. Comment: Traffic will be detoured to Exit 99 | Sullivan | Hudson Valley Catskill Area | 4/14/2013 6:27:04 PM | Closure Incidents | NY 17 |
 | NY 17 | NYSDOT: bridge construction, single line traffic alternating directions, width limit on NY 17 eastbound at Exit 92 - Old State Highway; Ramp starting 7:00 AM, 04/15/13 until 4:00 PM, 09/30/13. Comment: 12 foot lane restriction | Delaware | Hudson Valley Catskill Area | 4/14/2013 7:29:15 PM | Construction | NY 17 |
 | US 9W | NYSDOT - Region 8: roadwork on US 9W both directions between Forge Hill Road (New Windsor) and Caesars Lane (New Windsor) , Continuous Monday April 15th, 2013 12:00 AM thru Friday May 31st, 2013 11:59 PM right shoulder closure | Orange | Hudson Valley Catskill Area | 4/15/2013 7:39:35 AM | Construction | US 9W |
 | NY 5 | NYSDOT: construction work on NY 5 from NY 5B to NY 12 until 3:30 PM, 06/30/13 on weekday(s). Comment: NY 5 intermittent lane closures between NY 5B and Alexandria Road in New Hartford, due to traffic signal work. Flaggers will be utilized as needed. Minor delays. | Oneida | Central Syracuse Utica Area | 5/10/2013 3:45:19 PM | Construction | NY 5 |
 | NY 33 | NYSDOT: construction work on NY 33 both directions at Deerfield Avenue (Buffalo) | Erie | Niagara Buffalo Area | 5/19/2013 3:32:35 PM | Construction | NY 33 |
 | NY 8 | NYSDOT: bridge maintenance operations, reduced to one lane on NY 8 in both directions from Kellogg Road; CR 26 to Genesee Street; Ramp until 5:00 PM, 10/31/13 on weekday(s). Comment: NY 8 bridge over S&W Railroad. Northbound motorists will encounter a lane closure and lane shift. Southbound motorists will encounter a lane closure. Minor delays. | Oneida | Central Syracuse Utica Area | 4/15/2013 1:42:21 PM | Construction | NY 8 |
 | NY 5 | NYSDOT: bridge maintenance operations on NY 5 in both directions at NY 26 until 5:30 PM, 10/31/13 on weekday(s). Comment: NY 5 bridge over Sconondoa Creek, just west of NY 26, Vernon. Motorists will encounter lane shifts eastbound and westbound and a speed limit reduction to 45 mph in the work zone. Minor delays. | Oneida | Central Syracuse Utica Area | 5/10/2013 3:32:27 PM | Construction | NY 5 |
 | NY 12 | NYSDOT: bridge maintenance operations, reduced to one lane on NY 12 in both directions from NY 921D; Mappa Ave Extension to NY 365; on-Ramp until 5:30 PM, 11/30/13 on weekday(s). Comment: NY 12 bridge over Cincinnati Creek between Mappa Ave and Old Poland Road, Town of Trenton. Motorists will encounter a lane closure northbound and southbound and a speed limit reduction to 45 mph in the work zone. | Oneida | Central Syracuse Utica Area | 4/15/2013 2:23:47 PM | Construction | NY 12 |
 | NY 162 | NYSDOT: bridge maintenance operations, reduced to one lane on NY 162 in both directions at NY 5S; Hamlet of Sprakers until 5:00 PM, 09/30/13. Comment: NY 162 over Canalway Trail, Sprakers. One-way alternating traffic is being controlled by a tempory traffic signal. Northbound motorists will encounter a speed limit reduction to 45 mph. | Montgomery | Capital Region Albany Saratoga Area | 4/15/2013 2:33:16 PM | Construction | NY 162 |
 | NY 22 | NYSDOT: single line traffic alternating directions, road construction, temporary traffic lights on NY 22 in both directions from Town of Essex; Town of Westport Line to Town of Westport; Town of Moriah Line until 3:30 PM, 11/30/13. Comment: This roadwork will be between Wadhams and County Rte 8.There will be alternating one way traffic controled by a temporary traffic signal 24 hours a day. | Essex | Adirondack Watertown Plattsburgh Area | 4/15/2013 2:35:26 PM | Construction | NY 22 |
 | NY 12 | NYSDOT: construction work, reduced to one lane on NY 12 from Town of Hamilton; Town of Sherburne Line; Ramp to CR 88 until 3:30 PM, 10/31/13 on weekday(s). Comment: NY 12 intermittent lane closures between Albro Road and Madison/Chenango County line due to a multi-site culvert project. Minor delays. | Chenango | Central Syracuse Utica Area | 4/15/2013 2:40:50 PM | Construction | NY 12 |
 | NY 48 | NYSDOT: construction work, closed to traffic on NY 48 in both directions from City of Oswego; Town of Minetto Line to Town of Minetto; Town of Granby Line starting 7:00 AM, 05/17/13 until 5:30 PM, 05/24/13 on weekday(s). Comment: Detour in place from Northbound Route 48 to Cunningham Rd. to Minetto LysanderRoad to Route 48 Southbound opposite | Oswego | Central Syracuse Utica Area | 5/9/2013 2:24:23 PM | Closure Construction | NY 48 |
 | Michigan Hollow Road | NYSDOT: closed to traffic on Michigan Hollow Road in both directions from END ROUTE to START ROUTE Michigan Hollow Road; NY 415 due to bridge construction until 7:00 PM, 06/15/13. Comment: Bridge at Exit 1, I-390 deck repairs | Steuben | Southern Tier Homell Elmira Binghamton Area | 4/15/2013 11:26:58 PM | Closure Incidents | Michigan Hollow Road |
 | I-390 | NYSDOT: reduced to one lane on I-390 in both directions at Exit 1 - Michigan Hollow Road due to construction work starting 7:00 AM, 04/22/13 until 12:00 AM, 06/15/13. Comment: Bridge deck replacement. April 17 and continue for approximately 55 days.Deck removal : Lane closures and lane shifts will occur during daylight hours on I390 NB and SB for approx. 6 days. Night work will progress concurrently with traffic being diverted over the adjacent ramps sunset to sunrise. At the end of the deck removal I390 closures will cease. Short term delays, Detour on Michigan Hollow via I390: West bound 18 miles, East bound 5.5 miles | Steuben | Southern Tier Homell Elmira Binghamton Area | 4/15/2013 11:28:10 PM | Construction | I-390 |
 | I-87 Northway | NYSDOT: road construction, reduced to one lane on I-87 Northway northbound from Exit 32 -Garvey Mill Road to Town of Ausable; Town of Chesterfield Line until 3:30 PM, 11/30/13. Comment: There will be various single lane closures on I-87 North and South between 7am and 3:30pm only | Essex | Adirondack Watertown Plattsburgh Area | 4/16/2013 8:33:21 AM | Construction | I-87 Northway |
 | I-81 | NYSDOT: major road construction, slow moving maintenance vehicle on I-81 in both directions from Exit - I-81; NY 17 to Exit - I-88 until 6:00 PM, 12/30/13. Comment: "Starting April22, traffic patterns will be changing on NY 17 and I-81. Expect slow moving traffic and delays. Local commuters should consider alternate routes to and from Binghamton. For more info go to www.facebook.com/Prospect.Mountain.Project" | Broome | Southern Tier Homell Elmira Binghamton Area | 4/22/2013 11:03:28 AM | Construction | I-81 |
 | NY 13 | NYSDOT: road construction, narrow lanes on NY 13 in both directions at Lower Creek Road until 3:30 PM, 07/26/13. Comment: 24/7 work zone over Fall Creek. | Tompkins | Southern Tier Homell Elmira Binghamton Area | 4/29/2013 12:33:29 PM | Construction | NY 13 |
 | NY 36 | NYSDOT: single line traffic alternating directions on NY 36 in both directions from Main Street; Start NY 21 overlap to City of Hornell; Town of Hornellsville Line due to bridge construction until 5:00 PM, 10/31/13. Comment: Bridge Deck Replacement, Rte 36 over Loder St, City of HornellFor stage 1, two way traffic will be maintained in the Southbound lanes - stage 2 will be the reverse. | Steuben | Southern Tier Homell Elmira Binghamton Area | 4/17/2013 6:44:35 PM | Construction | NY 36 |
 | NY 296 | NYSDOT: single line traffic alternating directions and bridge construction on NY 296 both directions at NY 23 (Windham) look out for flagger | Greene | Hudson Valley Catskill Area | 5/19/2013 3:33:06 PM | Construction | NY 296 |
 | F Line | MTA NYC Transit Subway: Due to Construction Queens Bound F Line between W 4th Street-Washington Square Station and 34th Street-Herald Square Station, Monday May 13th, 2013 thru Friday May 24th, 2013, Monday/Tuesday/Wednesday/Thursday, 11:45 PM thru 05:00 AM, express only | New York | New York City Area | 5/18/2013 3:11:42 AM | Transit Construction | F Line |
 | NY 193 | NYSDOT: closed to traffic on NY 193 at I81; Exit 40 due to bridge construction starting 7:00 AM, 04/22/13 starting 7:00:00 AM, 4/22/2013 until further notice. Comment: There will be a signed detour in place. | Jefferson | Adirondack Watertown Plattsburgh Area | 4/19/2013 8:23:54 AM | Closure Construction | NY 193 |
 | I-81 | NYSDOT: reduced to one lane on I-81 in both directions from Exit 39; CR 90 to Exit 41; NY 178; West Church Street due to bridge construction starting 7:00 AM, 04/23/13 starting 7:00:00 AM, 4/23/2013 until further notice on weekday(s). Comment: These are daily lane closures to facilitate the demolition/construction of the Rt. 193 bridge over I-81. The closures will be removed daily after working hours and will be re-instituted each morning. | Jefferson | Adirondack Watertown Plattsburgh Area | 4/19/2013 8:27:58 AM | Construction | I-81 |
 | US 62 | NYSDOT: construction work on US 62 in both directions from Niagara Falls Boulevard; Sheridan Drive to Tonawanda Creek Road -- look out for flagger until 3:30 PM, 05/24/13 on weekday(s). Comment: Right lane closures as needed. | Erie | Niagara Buffalo Area | 5/16/2013 1:21:14 PM | Construction | US 62 |
 | NY 8 | NYSDOT: single line traffic alternating directions on NY 8 at Lake Pleasant Road due to construction work until 3:30 PM, 06/30/13. Comment: NY 8 culvert replacement just south of the NY 8/30 intersection. Motorists will encounter one-way alternating traffic controlled by a temporary traffic signal. Minor delays. | Hamilton | Adirondack Watertown Plattsburgh Area | 5/17/2013 3:04:58 PM | Construction | NY 8 |
 | I-790 | NYSDOT: reduced to two lanes on I-790 southbound from I-790 Bridge over Mohawk River to I-790 Bridge over Oriskany Street West; NY 5S; NY 5A; START ROUTE I-790 due to bridge maintenance operations starting 7:00 AM, 04/22/13 until 5:00 PM, 11/30/13. Comment: I-790 southbound bridge joint repairs from bridge over Barge Canal to Oriskany Blvd. Motorists will encounter a lane closure and speed limit reduction to 45 mph in the work zone. | Oneida | Central Syracuse Utica Area | 4/19/2013 12:45:24 PM | Construction | I-790 |
 | I-787 | NYSDOT: long term road construction, reduced to two lanes, long delays on I-787 southbound from Exit 4A southbound; Colonie Street to Exit 3A southbound; Dunn Bridge; Empire Plaza; US 9; US 20 starting 6:00:00 PM, 4/19/2013 until further notice. Comment: I-787 Sb will be reduced to two lanes 24 hours a day. The left lane will be closed and traffic will be subjected to the center and right lanes only. Expect long delays during peak travel times. This work will also restrict parking for boats at the corning preserve. Alternate boat launches are Rensselaer and Bethlehem | Albany | Capital Region Albany Saratoga Area | 5/5/2013 12:12:42 PM | Construction | I-787 |
 | I-81 | NYSDOT: long term road construction, reduced to one lane on I-81 in both directions from Exit 8 - NY 26; Ramp to Cortland - Broome County Line starting 6:37 AM, 04/22/13 until 6:00 PM, 07/29/13. | Broome | Southern Tier Homell Elmira Binghamton Area | 4/21/2013 4:39:03 PM | Construction | I-81 |
 | NY 201 | NYSDOT: bridge construction, reduced to one lane on NY 201 in both directions from Exit - NY 17 to Exit - NY 17C; Ramp starting 7:00 PM, 04/21/13 until 7:00 AM, 06/21/13. | Broome | Southern Tier Homell Elmira Binghamton Area | 4/21/2013 4:52:30 PM | Construction | NY 201 |
 | NY 17 | NYSDOT: bridge construction, reduced to one lane on NY 17 in both directions from Exit 81 - East Bosket Road to Exit 82 - NY 41 starting 7:08 AM, 04/22/13 until 6:00 PM, 09/30/13. | Broome | Southern Tier Homell Elmira Binghamton Area | 4/21/2013 5:12:11 PM | Construction | NY 17 |
 | US 20 | NYSDOT: closed to traffic on US 20 in both directions from NY 247 to CR 47 starting 2:00 PM, 04/22/13 until 4:00 PM, 06/28/13. Comment: NYS Rte 5&20 will be closed east of NYS Rte 247 and west of CR 47 for a culvert replacement. Detour will be posted. | Ontario | Finger Lakes Rochester Area | 4/22/2013 7:25:05 AM | Closure Construction | US 20 |
 | NY 193 | NYSDOT: closures on NY 193 at I81; Exit 40 (Ellisburg) closed to traffic. Comment: There will be a signed detour in place. | Jefferson | Adirondack Watertown Plattsburgh Area | 4/22/2013 6:47:39 AM | Closure Construction | NY 193 |
 | NY 7 | NYSDOT: exit ramp closed, long term road construction on NY 7 eastbound at Exit 73 - I-81 starting 3:00 PM, 04/22/13 until 4:00 PM, 12/30/13. Comment: Exit ramp from SR 7 to I-81 NB is closed until further notice | Broome | Southern Tier Homell Elmira Binghamton Area | 4/22/2013 10:59:50 AM | Closure Construction | NY 7 |
 | I-81 | NYSDOT: exit ramp closed, long term road construction on I-81 northbound at Exit 4 - NY 7; Ramp starting 3:00 PM, 04/22/13 until 4:00 PM, 12/30/13. Comment: I-81 northbound exit ramp to SR 7 will be closed until further notice | Broome | Southern Tier Homell Elmira Binghamton Area | 4/22/2013 10:59:34 AM | Closure Construction | I-81 |
 | US 20 | NYSDOT: closures on US 20 both directions between NY 247 (Hopewell) and CR 47 (Hopewell) closed to traffic until 4:00 P.M. Friday, June 28, 2013. Comment: NYS Rte 5&20 will be closed east of NYS Rte 247 and west of CR 47 for a culvert replacement. Detour will be posted. | Ontario | Finger Lakes Rochester Area | 4/22/2013 1:48:50 PM | Closure Construction | US 20 |
 | NY 7 | NYSDOT: long term road construction on NY 7 east at Exit 73 - I-81 (Binghamton) exit ramp closed until 4:00 P.M. Monday, December 30, 2013. Comment: Exit ramp from SR 7 to I-81 NB is closed until further notice | Broome | Southern Tier Homell Elmira Binghamton Area | 4/22/2013 2:48:56 PM | Closure Construction | NY 7 |
 | I-81 | NYSDOT: long term road construction on I-81 north at Exit 4 - NY 7; Ramp (Binghamton) exit ramp closed until 4:00 P.M. Monday, December 30, 2013. Comment: I-81 northbound exit ramp to SR 7 will be closed until further notice | Broome | Southern Tier Homell Elmira Binghamton Area | 4/22/2013 2:49:02 PM | Closure Construction | I-81 |
 | NY 26 | NYSDOT: bridge maintenance operations and single line traffic alternating directions on NY 26 south between Vestal Parkway East; NY 434 (Vestal) and East Main Street; NY 17C Junction Endicot (Union) | Broome | Southern Tier Homell Elmira Binghamton Area | 5/19/2013 3:32:40 PM | Construction | NY 26 |
 | NY 378 | NYSDOT: bridge construction on NY 378 in both directions at Menands Bridge; Albany-Rensselaer County Line -- approach with care starting 7:00:00 AM, 4/23/2013 until further notice. Comment: .There will be various lane closures in the area. Use caution | Albany | Capital Region Albany Saratoga Area | 4/23/2013 12:51:27 PM | Construction | NY 378 |
 | NY 19A | NYSDOT: long term road construction, single line traffic alternating directions, temporary traffic lights on NY 19A between Wyoming and Allegany County Line and Hamilton Street; NY 436 until 12:00 PM, 07/31/13. | Wyoming | Niagara Buffalo Area | 4/24/2013 7:44:16 AM | Construction | NY 19A |
 | NY 58 | NYSDOT: road construction, paving operations on NY 58 from Gouverneur South Village Line to Gouverneur North Village Line starting 7:00 AM, 05/08/13 until 5:00 PM, 06/01/13 on weekday(s). Comment: State forces will be tentatively starting road work in this area to mill existing road surface in anticipation of an upcoming Paving project here.Road will be open to alternate one way traffic controlled by flagpeople. | St. Lawrence | Adirondack Watertown Plattsburgh Area | 4/24/2013 4:37:34 PM | Construction | NY 58 |
 | NY 404 | NYSDOT: bridge maintenance operations, right lane closed on NY 404 at Five Mile Line Road; CR 18 starting 10:56:00 AM, 4/25/2013 until further notice. | Monroe | Finger Lakes Rochester Area | 4/25/2013 10:58:56 AM | Construction | NY 404 |
 | NY 5 | NYSDOT: long term road construction, reduced to one lane, delays on NY 5 in both directions at Route 7 starting 7:00 AM, 04/29/13 until 5:00 PM, 09/20/13. Comment: All traffic will be shifted to the south side of the bridge. There will be one lane maintained in both directions. | Schenectady | Capital Region Albany Saratoga Area | 4/27/2013 12:52:41 PM | Construction | NY 5 |
 | NY 93 | NYSDOT: construction work, single line traffic alternating directions, temporary traffic lights on NY 93 in both directions from Main Road; Ramp to Beattie Avenue; CR 14 -- look out for flagger until 5:30 PM, 05/24/13 on weekday(s). | Erie | Niagara Buffalo Area | 5/16/2013 11:18:16 AM | Construction | NY 93 |
 | NY 425 | NYSDOT: construction work, single line traffic alternating directions, temporary traffic lights on NY 425 in both directions from City of North Tonawanda; Town of Wheatfie Line to Lockport Road -- look out for flagger until 5:30 PM, 05/24/13 on weekday(s). | Niagara | Niagara Buffalo Area | 5/16/2013 11:21:27 AM | Construction | NY 425 |
 | Jefferson Avenue | NYSDOT - Region 8: roadwork on Jefferson Avenue both directions between Van Ranst Place (Mamaroneck) and Station Plaza (Mamaroneck) , Continuous Thursday April 25th, 2013 12:00 AM thru Tuesday December 31st, 2013 11:59 PM all lanes closed | Westchester | Hudson Valley Catskill Area | 4/25/2013 1:50:32 PM | Closure Construction | Jefferson Avenue |
 | US 62 | NYSDOT: construction work, single line traffic alternating directions on US 62 in both directions from Main Street; NY 39 to Town of Persia; Town of Dayton Line until 4:30 PM, 05/24/13 on weekday(s). | Erie | Niagara Buffalo Area | 5/16/2013 1:18:49 PM | Construction | US 62 |
 | NY 104 | NYSDOT: closed for repairs on NY 104 at North Clinton Avenue starting 7:00 AM, 05/01/13 until 5:00 PM, 08/01/13. Comment: Project D262286. The North Clinton ave Bridge over Route 104 in the City of Rochester will be closed for approx. 3 months for deck replacement. Detours are in place. | Monroe | Finger Lakes Rochester Area | 4/25/2013 5:00:02 PM | Closure Construction | NY 104 |
 | NY 33 | NYSDOT: bridge construction on NY 33 in both directions at East Delavan Avenue until 3:00 PM, 05/25/13. Comment: East Delevan Avenue over Route 33 reduced to a single lane in each direction. | Erie | Niagara Buffalo Area | 5/16/2013 11:23:23 AM | Construction | NY 33 |
 | NY 3 | NYSDOT: bridge construction on NY 3 from Town of Harrietstown; Village of Saranac Lake to River Street; Main Street until 4:00 PM, 06/30/13. Comment: The pedestrian bridge over Route 3 is being replaced. Any impacts on traffic should be minor. | Franklin | Adirondack Watertown Plattsburgh Area | 4/26/2013 9:16:02 AM | Construction | NY 3 |
 | NY 10 | NYSDOT: bridge maintenance operations on NY 10 both directions at NY 17 (Exit 84) connector to NY 8/NY 10; START ROUTE NY 10 | Delaware | Hudson Valley Catskill Area | 5/19/2013 3:32:10 PM | Construction | NY 10 |
 | Rockaway Ferry Service | SeaStreak Ferry: due to operational activity, both directions Rockaway Ferry Service Beach 108th Street/Beach Channel Drive (Queens) to Pier 11/Wall Street and East 34th Street/FDR Drive (Manhattan), Monday April 29th, 2013 thru Sunday June 30th, 2013, Monday thru Friday, 05:45 AM thru 08:40 PM | Queens | New York City Area | 4/29/2013 5:49:54 AM | Special Events | Rockaway Ferry Service |
 | Battery Park Underpass | NYSDOT - Region 11: construction on Battery Park Underpass northbound between The Battery (New York) and Morris Street , Continuous Monday April 29th, 2013 12:00 AM thru Monday May 20th, 2013 11:59 PM all lanes closed service road | New York | New York City Area | 4/29/2013 11:06:46 AM | Closure Construction | Battery Park Underpass |
 | Saint Nicholas Avenue | NYSDOT - Region 11: construction on Saint Nicholas Avenue between West 145th Street (New York) and West 124th Street to facilitate roadway/milling and resurfacing, Monday April 29th, 2013 thru Monday May 20th, 2013, Monday thru Friday, 09:00 PM thru 05:00 AM, all lanes closed | New York | New York City Area | 4/29/2013 12:22:18 PM | Closure Construction | Saint Nicholas Avenue |
 | 143rd Street | NYSDOT - Region 11: construction on 143rd Street between 5th Avenue (New York) and Edgecombe Avenue to facilitate roadway/milling and resurfacing, Monday April 29th, 2013 thru Monday May 20th, 2013, Monday thru Friday, 09:00 PM thru 05:00 AM, all lanes closed | New York | New York City Area | 4/29/2013 12:28:28 PM | Closure Construction | 143rd Street |
 | 142nd Street | NYSDOT - Region 11: construction on 142nd Street between 5th Avenue (New York) and Edgecombe Avenue to facilitate roadway/milling and resurfacing, Monday April 29th, 2013 thru Monday May 20th, 2013, Monday thru Friday, 09:00 PM thru 05:00 AM, all lanes closed | New York | New York City Area | 4/29/2013 12:32:24 PM | Closure Construction | 142nd Street |
 | 141st Street | NYSDOT - Region 11: construction on 141st Street between 5th Avenue (New York) and Edgecombe Avenue to facilitate roadway/milling and resurfacing, Monday April 29th, 2013 thru Monday May 20th, 2013, Monday thru Friday, 09:00 PM thru 05:00 AM, all lanes closed | New York | New York City Area | 4/29/2013 12:34:06 PM | Closure Construction | 141st Street |
 | Belt System - Southern Parkway | NYSDOT - Region 11: bridge work on Belt System - Southern Parkway eastbound at 130th Street; Ramp (New York) One night per week, Monday April 29th, 2013 thru Thursday May 30th, 2013, Monday thru Friday, 01:00 AM thru 05:00 AM, 2 lanes closed | Queens | New York City Area | 5/3/2013 11:18:35 AM | Construction | Belt System - Southern Parkway |
 | NY 10 | NYSDOT: long term road construction, reduced to one lane on NY 10 in both directions from Town of Jefferson; Town of Summit Line to Schoharie; Delaware County Line until 4:00 PM, 06/28/13. Comment: Work is to be done between Brady Road and Whiting Hollow Road | Schoharie | Capital Region Albany Saratoga Area | 4/29/2013 1:28:24 PM | Construction | NY 10 |
 | NY 5 | NYSDOT: paving operations, reduced to two lanes on NY 5 in both directions from Auburn City Line; Town of Sennett to Fulton Street Junction 20 Westbound starting 7:00 AM, 04/30/13 until 5:00 PM, 07/01/13 on weekday(s). Comment: Rte 5 will be reduced to two lanes, one East bound and the other West bound for milling and paving | Cayuga | Finger Lakes Rochester Area | 4/29/2013 3:31:50 PM | Construction | NY 5 |
 | I-86 | NYSDOT: bridge maintenance operations on I-86 from NY 21 to Town of Fremont; Town of Howard Line due to bridge maintenance operations until 3:30 PM, 05/31/13 on weekday(s). Comment: Pier repair. CR57 over I86, Fremont. Work in Center Median under bridge. | Steuben | Southern Tier Homell Elmira Binghamton Area | 4/30/2013 7:44:36 AM | Construction | I-86 |
 | Taconic State Parkway | NYSDOT - Region 8: roadwork on Taconic State Parkway southbound between Route 52; Ramp (East Fishkill) and Exit - I-84; Ramp (East Fishkill) , Monday May 20th, 2013 thru Friday May 24th, 2013, Monday thru Friday, 07:00 AM thru 04:00 PM, left shoulder closure | Dutchess | Hudson Valley Catskill Area | 5/17/2013 4:00:22 PM | Construction | Taconic State Parkway |
 | NY 33 | NYSDOT: construction work on NY 33 in both directions from Fillmore Avenue to Exit - Grider Street until 4:00 PM, 05/25/13. Comment: ECMC access road is closed for repair. Follow posted detour. | Erie | Niagara Buffalo Area | 5/16/2013 11:34:11 AM | Construction | NY 33 |
 | NY 28 | NYSDOT - Region 8: roadwork on NY 28 northbound between Albany Avenue; NY 32; Broadway; START ROUTE NY 28 (Kingston) and Sawkill Road (Kingston) , Continuous Thursday May 9th, 2013 7:15 AM thru Wednesday June 26th, 2013 11:59 PM right lane and shoulder closures | Ulster | Hudson Valley Catskill Area | 5/10/2013 7:19:13 AM | Construction | NY 28 |
 | NY 104 | NYSDOT: closures on NY 104 at North Clinton Avenue (Rochester) closed for repairs until 5:00 P.M. Thursday, August 1, 2013. Comment: Project D262286. The North Clinton ave Bridge over Route 104 in the City of Rochester will be closed for approx. 3 months for deck replacement. Detours are in place. | Monroe | Finger Lakes Rochester Area | 5/1/2013 6:47:59 AM | Closure Construction | NY 104 |
 | # 1 Line | MTA NYC Transit Subway: Due to Construction Bronx Bound # 1 Line between 215th Street Station and 242nd Street-Van Cortlandt Park Station, Wednesday May 15th, 2013 thru Friday May 24th, 2013, Wednesday/Thursday/Friday, 10:45 AM thru 03:00 PM | New York | New York City Area | 5/18/2013 3:10:41 AM | Transit Construction | # 1 Line |
 | G Line | MTA NYC Transit Subway: Due to Construction both directions G Line between Court Square Station and Hoyt-Schermerhorn Station, Monday May 13th, 2013 thru Friday May 24th, 2013, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM | Queens | New York City Area | 5/18/2013 3:10:36 AM | Transit Construction | G Line |
 | NY 9P | NYSDOT: single line traffic alternating directions on NY 9P in both directions at NY 423 due to road construction -- look out for flagger until 3:00 PM, 05/24/13 on weekday(s). Comment: This roadwork will be between Jib Drive and Rte 423. The work will take place between 9am and 3pm Monday - Friday. | Saratoga | Capital Region Albany Saratoga Area | 5/15/2013 2:19:31 PM | Construction | NY 9P |
 | CTY TRM Zone Branch | MTA Long Island Rail Road: due to Elevator Malfunction CTY TRM Zone Branch at New York Penn Station (Manhattan) Penn Station E, Platform 10, Tracks 18 & 19, between platform and LIRR level is out of service until further notice also Jamaica Station Between NYCT, street level and portal mezzanine is out of service until further notice | New York | New York City Area | 5/19/2013 10:21:49 PM | Transit Incidents | CTY TRM Zone Branch |
 | NY 16 | NYSDOT: construction work on NY 16 in both directions at Town of Franklinville; Town of Ischua Line starting 4:34:00 PM, 5/1/2013 until further notice. | Cattaraugus | Niagara Buffalo Area | 5/1/2013 4:35:06 PM | Construction | NY 16 |
 | NY 400 | NYSDOT: construction work, reduced to one lane on NY 400 in both directions from Girdle Road to Olean Road; NY 16 until 7:00 PM, 05/24/13 on weekday(s). | Erie | Niagara Buffalo Area | 5/16/2013 12:36:36 PM | Construction | NY 400 |
 | 951V | NYSDOT: bridge construction on 951V in both directions at NY 16 starting 7:00:00 AM, 5/2/2013 until further notice. Comment: Lane closures as needed. | Erie | Niagara Buffalo Area | 5/2/2013 2:04:20 PM | Construction | 951V |
 | NY 104 | NYSDOT: road maintenance operations, reduced to one lane, stop and go traffic on NY 104 in both directions from Town of Sterling; Town of Victory Line to Town of Sterling; Town of Victory Line starting 7:00 AM, 05/09/13 until 4:00 PM, 05/31/13 on weekday(s). Comment: NY-104 EB AND WB REDUCED TO ONE LANE TOWN OF STERLING | Cayuga | Finger Lakes Rochester Area | 5/2/2013 5:30:02 PM | Construction | NY 104 |
 | NY 34 | NYSDOT: road maintenance operations, single line traffic alternating directions on NY 34 in both directions from Town of Venice; Town of Scipio Line to Town of Ira; Town of Cato Line -- look out for flagger until 4:00 PM, 05/31/13 on weekday(s). Comment: Guiderail replacement in various locations from Long Hill Road in Venice Center to Main Street, Village of Cato | Cayuga | Finger Lakes Rochester Area | 5/7/2013 12:08:44 PM | Construction | NY 34 |
 | CTY TRM Zone Branch | MTA Long Island Rail Road: due to Escalator Malfunction CTY TRM Zone Branch at New York Penn Station (Manhattan) 34th Street Corridor B, between street level and LIRR Concourse level is out of service, until further notice. | New York | New York City Area | 5/19/2013 10:22:06 PM | Transit Incidents | CTY TRM Zone Branch |
 | I-90 - NYS Thruway | NYS Thruway Authority CAD: road maintenance operations, left lane closed on I-90 - NYS Thruway eastbound from after Exit 29 (I-90) - Canajoharie (Rte 10) to before Exit 29A (I-90) - Little Falls (Rte 169) for the next three weeks. | Montgomery | Capital Region Albany Saratoga Area | 5/3/2013 10:14:41 AM | Construction | I-90 - NYS Thruway |
 | NY 177 | NYSDOT: reduced to one lane on NY 177 from Town of Rodman; Town of Adams Line to CR 69; Rodman due to bridge maintenance operations starting 7:00 AM, 05/13/13 starting 7:00:00 AM, 5/13/2013 until further notice. Comment: The Route 177 bridge over the North Branch of Sandy Creek is being rehabilitated. Single lane traffic will be controlled by temporary signals. | Jefferson | Adirondack Watertown Plattsburgh Area | 5/3/2013 10:43:13 AM | Construction | NY 177 |
 | I-787 | NYSDOT: road construction on I-787 northbound at Exit 3 northbound; Dunn Bridge; Empire Plaza; US 9; US 20 -- right exit ramp approach with care starting 9:00 AM, 05/06/13 until 3:00 PM, 06/07/13. Comment: This roadwork will be I-787 northbound on the ramp to the Empire State Plaza(South Mall Expressway).There will be a lane shift that will begin at 9am on May 6th and remain in place until approximately 3pm June 7th. | Albany | Capital Region Albany Saratoga Area | 5/3/2013 12:40:29 PM | Construction | I-787 |
 | South Mall Expressway | NYSDOT: road construction on South Mall Expressway at Empire State Plaza -- right entrance ramp approach with care starting 9:00 AM, 05/06/13 until 3:00 PM, 06/07/13. Comment: This roadwork is on the ramp from the Southmall Expressway to I-787 north. There will be a lane shift that will begin at 9am on May 6th and remain in place until approximately 3pm June 7th. | Albany | Capital Region Albany Saratoga Area | 5/3/2013 12:39:14 PM | Construction | South Mall Expressway |
 | US 20 | NYSDOT: road construction, right lane closed on US 20 westbound from Dunn Memorial Bridge; City of Albany; City of Rensselaer Line; Albany-Rensselaer County Line to Green Street -- approach with care starting 9:00 AM, 05/06/13 until 3:00 PM, 06/07/13. Comment: This roadwork will be on the Rte 9&20 ramp to the South Mall Expressway. There will be a singe right lane closure that will begin at 9am on May 6th and remain in place until approximately 3pm June 7th. | Albany | Capital Region Albany Saratoga Area | 5/3/2013 12:46:44 PM | Construction | US 20 |
 | NY 185 | NYSDOT: road construction on NY 185 in both directions at Crown Point Bridge starting 7:00 AM, 05/06/13 until 8:00 PM, 06/21/13. Comment: All work will take place on the Crown Point Bridge. The sidewalk will be closed on the bridge. All travel lanes will remain ope | Essex | Adirondack Watertown Plattsburgh Area | 5/3/2013 12:59:37 PM | Construction | NY 185 |
 | I-81 | NYSDOT: bridge construction on I-81 in both directions from Exit 44; NY 232 to CR 62 Ramp starting 1:00:00 PM, 5/3/2013 until further notice. | Jefferson | Adirondack Watertown Plattsburgh Area | 5/3/2013 1:02:12 PM | Construction | I-81 |
 | NY 5 | NYSDOT: lane closures on NY 5 between Schuyler Street (Amsterdam) and NY 67; NY 30 (Amsterdam) | Montgomery | Capital Region Albany Saratoga Area | 5/19/2013 3:33:01 PM | Incidents | NY 5 |
 | NY 29 | NYSDOT: right shoulder closed on NY 29 in both directions at Town of Broadalbin; Village of Broadalbin line due to construction work until 3:30 PM, 10/31/13 on weekday(s). Comment: NY 29 between Pine Street and Honeywell Corners culvert repairs. Motorists will encounter shoulder closures and intermittent flagger-controlled lane closures.. | Fulton | Capital Region Albany Saratoga Area | 5/17/2013 2:18:01 PM | Construction | NY 29 |
 | NY 49 | NYSDOT: exit ramp closed on NY 49 eastbound from City of Utica; Town of Marcy Line to END ROUTE; NY 49; NY 8 due to bridge maintenance operations until 5:00 PM, 06/22/13. Comment: NY 49 eastbound ramp to NY 5 west, NY 8 south, NY 12 south to Downtown Utica will be closed for approximately 6 weeks. A signed detour is in place. | Oneida | Central Syracuse Utica Area | 5/3/2013 3:47:50 PM | Closure Construction | NY 49 |
 |